Showing top 10 enacted projects. Sign up free to see more, or start a 7-day trial to see all projects.
Total Projects
106
Total Amount
$291.7M
Enacted
10
of 10 shown
Requested
0
pipeline
Top 10 projects (enacted only) of 106 total
Search this agency →To develop shoreline protection for the city's sewage facility.
Lisa Murkowski
A regional economic hub, an international heritage site, and an iconic public space, City Dock is also at the front lines of climate change and endures an increasing number of punishing floods each year. The redesigned and reengineered City Dock will have a transformative effect on the downtown experience, the economy, and the environment. As a world-class waterfront park, the City Dock will be able to host more events, welcome more visitors, expand cultural programs, invigorate downtown commerc
Benjamin Cardin
City Dock is an economic and cultural hub in Annapolis, accommodating small businesses, restaurants, boaters, tourists, and residents. It is also subject to climate change-driven flooding that can prevent access to buildings and cause damage. Federal funds will be used to support the development, design and construction of flood mitigation and resiliency infrastructure including installation of flood barriers, reduction in non-pervious areas, storm-drain improvements, storm water pump-stations,
Christopher Van Hollen
Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25
Amy Klobuchar
"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje
Tina Smith
Facility upgrade and modernization
Lindsey Graham
Installation of a two (2) tier protective support system to stabilize the bluff to preserve a village facility from destruction. The installation of these walls will be performed in two (2) phases.
Charles Schumer
Funds will be used for design and construction of flood mitigation measures identified in a 2020 Local Flood Hazard Analysis. Mitigation measures will include flood barriers and stormwater system improvements to reduce or eliminate 100-year flood risk to over 1200 residential and commercial properties in the City of Ithaca.
Charles Schumer
This project will construct flood barriers, reconstruct existing levees, install backflow prevention devices, and modify the existing storm sewer system.
Kirsten Gillibrand
Upgrades to the New Orleans Emergency Operations Center
Bill Cassidy