Skip to main content
All agencies
DHS

Agency Funding Snapshot

Homeland Security

House CPF & Senate CDS — earmark funding directed to this agency

🔔 Track

Showing top 10 enacted projects. Sign up free to see more, or start a 7-day trial to see all projects.

Total Projects

519

Total Amount

$1.03B

Enacted

10

of 10 shown

Requested

0

pipeline

Top 10 projects (enacted only) of 519 total

Search this agency →
✓ EnactedFY2023 · AK · Senate CDS

To develop shoreline protection for the city's sewage facility.

Lisa Murkowski

$36.0M
✓ EnactedFY2022 · TX · House CPF

Stormwater Detention Basin and Culvert Improvement

Sheila Jackson Lee

$22.7M
✓ EnactedFY2023 · MD · Senate CDS

City Dock is an economic and cultural hub in Annapolis, accommodating small businesses, restaurants, boaters, tourists, and residents. It is also subject to climate change-driven flooding that can prevent access to buildings and cause damage. Federal funds will be used to support the development, design and construction of flood mitigation and resiliency infrastructure including installation of flood barriers, reduction in non-pervious areas, storm-drain improvements, storm water pump-stations,

Christopher Van Hollen

$20.0M
✓ EnactedFY2026 · KY · House CPF

First Responders Communication Equipment

Harold Rogers

$20.0M
✓ EnactedFY2023 · MD · Senate CDS

A regional economic hub, an international heritage site, and an iconic public space, City Dock is also at the front lines of climate change and endures an increasing number of punishing floods each year. The redesigned and reengineered City Dock will have a transformative effect on the downtown experience, the economy, and the environment. As a world-class waterfront park, the City Dock will be able to host more events, welcome more visitors, expand cultural programs, invigorate downtown commerc

Benjamin Cardin

$20.0M
✓ EnactedFY2026 · AL · House CPF

Access Control Point

Michael Rogers

$18.0M
✓ EnactedFY2023 · MN · Senate CDS

"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje

Tina Smith

$18.0M
✓ EnactedFY2023 · MN · Senate CDS

Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25

Amy Klobuchar

$18.0M
✓ EnactedFY2022 · TX · House CPF

TC Jester Storm water Detention Basin Project

Dan Crenshaw

$15.0M
✓ EnactedFY2022 · AK · Senate CDS

To provide Emergency Operations Center Grant Program funding to the Alutiiq Tribe of Old Harbor for the purposes of constructing a new tsunami shelter community center.

Lisa Murkowski

$15.0M