Smart Filters locked — Agency, Category, Use Case, and Recipient Type filters are available on trial and paid plans.
Try these searches
Showing enacted projects only. Senate CDS requested data and all project statuses are available on paid plans.
Start free trialShowing top 25 of 519 enacted results · 112,898 total in database (filtered)
Start a 7-day evaluation trial to export projects (50-row lifetime sample)
Congressional earmarks only — CPF & CDS. Not competitive grants. What is this data?
City of Dillingham
To develop shoreline protection for the city's sewage facility.
$36.0M
Harris County Texas
Stormwater Detention Basin and Culvert Improvement
$22.7M
The Center for Rural Development
First Responders Communication Equipment
$20.0M
City of Annapolis
City Dock is an economic and cultural hub in Annapolis, accommodating small businesses, restaurants, boaters, tourists, and residents. It is also subject to climate change-driven flooding that can prevent access to buildings and cause damage. Federal funds will be used to support the development, design and construction of flood mitigation and resiliency infrastructure including installation of flood barriers, reduction in non-pervious areas, storm-drain improvements, storm water pump-stations,
$20.0M
City of Annapolis
A regional economic hub, an international heritage site, and an iconic public space, City Dock is also at the front lines of climate change and endures an increasing number of punishing floods each year. The redesigned and reengineered City Dock will have a transformative effect on the downtown experience, the economy, and the environment. As a world-class waterfront park, the City Dock will be able to host more events, welcome more visitors, expand cultural programs, invigorate downtown commerc
$20.0M
Anniston Army Depot
Access Control Point
$18.0M
Oslo Region Joint Powers Board
Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25
$18.0M
Oslo Region Joint Powers Board
"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje
$18.0M
Harris County Flood Control District
TC Jester Storm water Detention Basin Project
$15.0M
Alutiiq Tribe of Old Harbor
To provide Emergency Operations Center Grant Program funding to the Alutiiq Tribe of Old Harbor for the purposes of constructing a new tsunami shelter community center.
$15.0M
SC Emergency Management Division
Facility upgrade and modernization
$10.9M
City of Birmingham
Funding for critical disaster mitigation infrastructure improvements.
$10.0M
Oakland County
Oakland County/Northern Border Patrol Helicopter
$10.0M
City of Golden
This project will support construction of a flood attenuation facility to reduce the flow rate of stormwater runoff. As a result of the project, six commercial properties, 40 mobile home residences, and 81 low-income households will be removed from the floodplain and floodway.
$10.0M
Village of Port Jefferson
Installation of a two (2) tier protective support system to stabilize the bluff to preserve a village facility from destruction. The installation of these walls will be performed in two (2) phases.
$10.0M
City of Golden
Construction of a flood attenuation facility, park, and recreation facility.
$10.0M
City of Hoquiam
Aberdeen-Hoquiam Flood Protection Project
$9.9M
City of Ithaca
Funds will be used for design and construction of flood mitigation measures identified in a 2020 Local Flood Hazard Analysis. Mitigation measures will include flood barriers and stormwater system improvements to reduce or eliminate 100-year flood risk to over 1200 residential and commercial properties in the City of Ithaca.
$9.0M
City of Ithaca
This project will construct flood barriers, reconstruct existing levees, install backflow prevention devices, and modify the existing storm sewer system.
$9.0M
Harris County Flood Control District
Westador Stormwater Detention Basin
$8.3M
Benton County
Funding is requested for a new emergency operations center in Benton County, Oregon.
$8.2M
Incorporated Village of Garden City
Edgemere Fire Station 2 Renovation and Structural Repairs
$8.0M
Fond du Lac Band of Lake Superior Chippewa
The proposed use of the Congressionally Directed funding will be to build a new Law Enforcement and Emergency Management facility for the Fond du Lac Band of Lake Superior Chippewa.
$8.0M
Fond du Lac Band of Lake Superior Chippewa
This request is to construct a new law enforcement and emergency management building for the Fond du Lac Band of Lake Superior Chippewa. The current building Fond du Lac Law Enforcement is located in has a number of deficiencies that does not allow the police department officers and staff to effectively or efficiently do their duties. Also, the Emergency Management Division was created in 2017 and has not had a permanent location and needs space to grow and to store the departments equipment.
$8.0M
City of North Chicago
North Chicago Storm Sewer
$7.8M
504 more projects match your search
Sign up free and start a trial to unlock all 519 results and CSV export.