Skip to main content
Back to search

Oslo Region Joint Powers Board

"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Co-Requestors

Tina Smith
Senate · MNRequestor

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje

Recipient Organization

Oslo Region Joint Powers Board

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
GAO Tracking the Funds
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
water infrastructure

Found an error in this record?

Report a data error
Technical & source detail
Record ID
696a45a0-48f9-40ff-a52e-f6580df2b2b7

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/696a45a0-48f9-40ff-a52e-f6580df2b2b7" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

TS

Tina Smith

D · MN · Senate

(202) 224-5641

Confirmed from FFID congressional source

OB

Oslo Region Joint Powers Board

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

DH

DHS

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.