Showing top 10 enacted projects. Sign up free to see more, or start a trial for full access.
Total Projects
0
Total Amount
N/A
Enacted
10
of 10 shown
Requested
0
pipeline
Top 10 projects (enacted only)
Search this agency →Funding is requested to construct a new dam to prevent destruction from existing dam failure.
Ronald Wyden
Install upgraded coastal revetment along Lake Michigan shoreline
Tammy Baldwin
Lake County Combined EOC
Bradley Schneider
Stormwater Detention Basin and Culvert Improvement
Sheila Jackson Lee
To repair or replace failing pump stations in Cahokia Heights and bring its sewer system to a sufficient working condition.
Richard Durbin
To renovate the stormwater and wastewater system in Cahokia Heights, Illinois.
Tammy Duckworth
Project to address the massive tree die off and wildfire threat in the East Bay Area.
Alejandro Padilla
Coastline erosion revetment projects along the Lake Michigan shoreline
Tammy Baldwin
For an 8-minute video summary of the project, please see fixtheflood.org The Red River of the North, bordering MN and ND, is extremely susceptible to spring and summer flooding events, overtopping roads and rail transportation and inundating farmland. This disrupts traffic by closing I-29 and all highway access through Oslo, MN on MN Hwy 1, and to ND Hwy 54, a trunk highway connecting northern Minnesota to I-29, as well as rail commerce delivering agricultural products to market. In the last
Tina Smith
The project is a well-studied and publicly accepted solution to mitigate the frequency and intensity of flooding. Removing blockages in the river channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel will lead to a significant reduction in flood occurrences
Amy Klobuchar