FFID tracks all House Community Project Funding (CPF) and Senate Congressionally Directed Spending (CDS) earmarks in Minnesota across FY2022–FY2027 — normalized by recipient, member, agency, and status, updated every Monday. These projects represent confirmed congressional funding intent — visible before downstream procurement opportunities appear on SAM.gov or Grants.gov. Learn how the data is sourced →
Showing top 10 enacted projects. Sign up free to see more, or start a free 7-day trial to see all statuses and projects.
Total Projects
686
Total Amount
$1.61B
Members Sponsoring
3
Top 10 Enacted Projects
Showing enacted projects only. Start a free 7-day trial to see all 686 projects including Senate CDS requested data.
Otter Tail County
Architect Bill Hickey with Collaborative Design Group reported in January 2021 that an ongoing Regional Treatment Center (RTC) Reuse Master Plan study commissioned by the City of Fergus Falls reached two major conclusions. First, while affected by lack of occupancy, age, and deferred maintenance, the Kirkbride is structurally sound. Second, based on analysis of reuse options suggested by the community and recommended by the RTC Reuse Master Plan Advisory Committee, the most viable option is to r
$39.0M
Carver County
The US 212 Rural Freight Mobility and Safety Project will expand 5.5 miles of US Highway (US) 212, an existing Principal Arterial roadway, from a rural two-lane undivided highway to a four-lane divided expressway from CSAH 34 in Norwood Young America to CSAH 36 in Cologne and construct Reduced Conflict Intersections (RCIs) and a grade-separated interchange at CSAH 51. This Project will improve the rural transportation system and freight travel by reconstructing the 90-year-old roadway, adding ca
$25.0M
Highway 212 Rural Freight Mobility and Safety: Carver County $25 million
Highway 212 Rural Freight Mobility and Safety: Carver County $25 million
$25.0M
Oslo Region Joint Powers Board
"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje
$18.0M
Oslo Region Joint Powers Board
Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25
$18.0M
City of Fairmont
The funds will be utilized for the construction of the biosolids processing facility at the City's wastewater treatment facility. The planning and design work for this project is complete and the project is shovel ready.
$15.0M
City of Albert Lea
The city will need to update the infrastructure at the Wastewater Treatment Facility (WWTF) to support area industries that produce food while maintaining the city's high standards for improving area natural resources and meeting new NPDES phosphorus limits.
$15.0M
City of Albert Lea
The city will need to update the infrastructure at the Wastewater Treatment Facility (WWTF) to support area industries that produce food while maintaining the city's high standards for improving area natural resources and meeting new NPDES phosphorus limits.
$15.0M
City of Fairmont
The funds will be utilized for the construction of the biosolids processing facility at the City's wastewater treatment facility. The planning and design work for this project is complete and the project is shovel ready.
$15.0M
Carver County Community Development Agency
Trail's Edge Senior is a 76 unit senior housing project for 55 and older located in Waconia. This project will create new affordable housing opportunities for seniors in the area.
$14.7M
676 more projects in Minnesota
Including Senate CDS requests for FY2025 and FY2026
Top Members
Top 5 by funding amount