FFID tracks all House Community Project Funding (CPF) and Senate Congressionally Directed Spending (CDS) earmarks in Minnesota across FY2022–FY2027 — normalized by recipient, member, agency, and status, updated every Monday. These projects represent confirmed congressional funding intent — visible before downstream procurement opportunities appear on SAM.gov or Grants.gov. Learn how the data is sourced →
Showing top 10 enacted projects. Sign up free to see more, or start a free 7-day trial to see all statuses and projects.
Total Projects
130
Total Amount
$285.6M
Members Sponsoring
6
Top 10 Enacted Projects
Showing enacted projects only. Start a free 7-day trial to see all 130 projects including Senate CDS requested data.
Oslo Region Joint Powers Board
Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25
$18.0M
Oslo Region Joint Powers Board
"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje
$18.0M
The City of Saint Paul
North End Community Center
$8.0M
City of Saint Paul
Funding is needed to complete construction of the North End Community Center, a new 25,000 square foot building with enhancements to the existing 5.6-acre park in Saint Paul's North End neighborhood. This community center will replace the obsolete Rice Recreation Center and provide a modern community hub with amenities requested and needed by the community. The center and parkland sit nestled between the Rice Street Library and the Paul and Sheila Wellstone Elementary School. The project will pr
$8.0M
Regents of the University of Minnesota
Cereal Disease Lab: St. Paul, MN
$7.0M
Avenues for Youth
Avenues for Youth Housing and Headquarters
$6.0M
City of Cottage Grove
City of Cottage Grove - 80th Street Transportation and Infrastructure Project
$5.9M
Laureen Bodin
Trunk Highway 25
$5.8M
City of Saint Paul
The Como Zoo currently does not have the funds available to change over a 40 year old plus inefficient natural gas steam boiler to a more energy efficient heating and cooling system to begin the decarbonization of the Como Zoo Campus. The Hydro Geothermal Heat Pump (HGHP) achieves a much higher performance profile than a natural gas steam boiler and even more than a traditional geothermal system.
$5.5M
Perspectives Inc.
"Seed the Change Campaign was not only a result of our Board’s spirit of social entrepreneurship, it also is the result of 45 years of the involvement of thousands of community volunteers, hundreds of community partners, a solid funding base, and visionary leadership. Throughout Perspectives’ history, we have both advocated and provided comprehensive programming to our population of focus, acknowledging early on that they have suffered from institutional obstacles to life-changing op
$5.0M
120 more projects in Minnesota
Including Senate CDS requests for FY2025 and FY2026
Top Members
Top 5 by funding amount · 6 total