Skip to main content
Back to search

Laureen Bodin

Purpose: The project includes the complete reconstruction of Trunk Highway 25, including watermain, sanitary sewer, storm sewer, sidewalks, trails, streetlights, curb and gutter, and street surfacing. A wide sidewalk and bike lanes will be constructed along the corridor to accommodate bicyclists and pedestrians. \n\nValue to the Taxpayer: The project provides many benefits to taxpayers within the region, including environmental, economic, sustainability, safety, mobility, and quality of life. Water quality of Buffalo Lake will be improved by eliminating accidental sewage discharges into Buffalo Lake, significantly reducing impervious surfaces along the lake, and adding storm water treatment units. Improving the connections between downtown Buffalo and Buffalo Lake and investing in public space will spur additional re-development in the area, which will increase real estate value and increase tax base. Pedestrian safety will be greatly increased with focused crosswalks with median refuges and decreased traffic speeds. Turn lanes will reduce accidents and decrease traffic delays. The overall quality of life will be improved with the additional public open space, connecting Buffalo Lake and the adjacent popular Sturges Park to retail and commercial establishments, high-density residential areas, and senior living, all of which are located within downtown Buffalo. \n\nDowntown Buffalo is the heart of the community and is pedestrian centric. Sturges Park is located across TH 25 from the downtown area and is the City of Buffalo\u2019s most utilized park, hosting many regional activities throughout the year. Though this project is highly beneficial and greatly needed, costs are high and are burdensome to the City of Buffalo.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

Purpose: The project includes the complete reconstruction of Trunk Highway 25, including watermain, sanitary sewer, storm sewer, sidewalks, trails, streetlights, curb and gutter, and street surfacing. A wide sidewalk and bike lanes will be constructed along the corridor to accommodate bicyclists and pedestrians. \n\nValue to the Taxpayer: The project provides many benefits to taxpayers within the region, including environmental, economic, sustainability, safety, mobility, and quality of life. Water quality of Buffalo Lake will be improved by eliminating accidental sewage discharges into Buffalo Lake, significantly reducing impervious surfaces along the lake, and adding storm water treatment units. Improving the connections between downtown Buffalo and Buffalo Lake and investing in public space will spur additional re-development in the area, which will increase real estate value and increase tax base. Pedestrian safety will be greatly increased with focused crosswalks with median refuges and decreased traffic speeds. Turn lanes will reduce accidents and decrease traffic delays. The overall quality of life will be improved with the additional public open space, connecting Buffalo Lake and the adjacent popular Sturges Park to retail and commercial establishments, high-density residential areas, and senior living, all of which are located within downtown Buffalo. \n\nDowntown Buffalo is the heart of the community and is pedestrian centric. Sturges Park is located across TH 25 from the downtown area and is the City of Buffalo\u2019s most utilized park, hosting many regional activities throughout the year. Though this project is highly beneficial and greatly needed, costs are high and are burdensome to the City of Buffalo.

Recipient Organization

Laureen Bodin

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
3b3c9428-cc45-4532-9a10-a7e67781572c

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/3b3c9428-cc45-4532-9a10-a7e67781572c" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

TE

Tom Emmer

R · MN · District MN-06

(202) 225-2331

Confirmed from FFID congressional source

LB

Laureen Bodin

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.