Skip to main content
Back to search

City of Saint Paul

The Como Zoo currently does not have the funds available to change over a 40 year old plus inefficient natural gas steam boiler to a more energy efficient heating and cooling system to begin the decarbonization of the Como Zoo Campus. The Hydro Geothermal Heat Pump (HGHP) achieves a much higher performance profile than a natural gas steam boiler and even more than a traditional geothermal system.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Co-Requestors

Tina Smith
Senate · MNRequestor

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The Como Zoo currently does not have the funds available to change over a 40 year old plus inefficient natural gas steam boiler to a more energy efficient heating and cooling system to begin the decarbonization of the Como Zoo Campus. The Hydro Geothermal Heat Pump (HGHP) achieves a much higher performance profile than a natural gas steam boiler and even more than a traditional geothermal system.

Recipient Organization

City of Saint Paul

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
GAO Tracking the Funds
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
research innovation

Found an error in this record?

Report a data error
Technical & source detail
Record ID
0ebb235d-8e85-45f7-9d99-a477377a23fc

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/0ebb235d-8e85-45f7-9d99-a477377a23fc" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

TS

Tina Smith

D · MN · Senate

(202) 224-5641

Confirmed from FFID congressional source

CP

City of Saint Paul

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

US

USACE

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

high confidence

Likely procurement owner

federal agency

Funding vehicle

direct federal contract

Expected channel

SAM.gov federal procurement

DoD and military construction projects are direct federal procurements. SAM.gov is the correct primary channel.

USACE civil works (flood control, navigation, environmental restoration) are direct federal procurements on SAM.gov.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.