FFID tracks all House Community Project Funding (CPF) and Senate Congressionally Directed Spending (CDS) earmarks in Maryland across FY2022–FY2027 — normalized by recipient, member, agency, and status, updated every Monday. These projects represent confirmed congressional funding intent — visible before downstream procurement opportunities appear on SAM.gov or Grants.gov. Learn how the data is sourced →
Showing top 10 enacted projects. Sign up free to see more, or start a free 7-day trial to see all statuses and projects.
Total Projects
710
Total Amount
$1.14B
Members Sponsoring
5
Top 10 Enacted Projects
Showing enacted projects only. Start a free 7-day trial to see all 710 projects including Senate CDS requested data.
US Army Corps of Engineers
The Mid-Chesapeake Bay Island project provides a long-term strategy for placement of material dredged from the approach channels to the Port of Baltimore while maximizing the use of dredged materials as a beneficial resource. Mid-Bay will restore and expand approximately 2,000 acres of island habitat that will be utilized by fish, shellfish, reptiles, amphibians, and migratory and shore birds. Preconstruction engineering and design for the project has been fully funded and USACE is ready for a n
$37.5M
Maryland Transit Administration
I request $20 million in Congressionally Directed Spending to support the Baltimore Penn Station Facilities and Multi-Modal Access Project. This project proposes a suite of station facilities enhancements, including multi-modal infrastructure investments to facilitate walking, bicycling, transit, and shared ride access to and from one of the main gateways to Baltimore and the eight busiest passenger rail station in our national system. Improved connection to the station from the surrounding comm
$20.0M
City of Annapolis
A regional economic hub, an international heritage site, and an iconic public space, City Dock is also at the front lines of climate change and endures an increasing number of punishing floods each year. The redesigned and reengineered City Dock will have a transformative effect on the downtown experience, the economy, and the environment. As a world-class waterfront park, the City Dock will be able to host more events, welcome more visitors, expand cultural programs, invigorate downtown commerc
$20.0M
City of Annapolis
City Dock is an economic and cultural hub in Annapolis, accommodating small businesses, restaurants, boaters, tourists, and residents. It is also subject to climate change-driven flooding that can prevent access to buildings and cause damage. Federal funds will be used to support the development, design and construction of flood mitigation and resiliency infrastructure including installation of flood barriers, reduction in non-pervious areas, storm-drain improvements, storm water pump-stations,
$20.0M
Baltimore County Government
Middle River Fire Company Improvements and Upgrades
$16.0M
Housing Authority of the City of College Park
Housing Authority of the City of College Park MD Renovation of Attick Towers Apartments
$16.0M
Maryland Department of Transportation
Enhancing Eastern Shore Freight Rail Growth and Reliability
$16.0M
U.S. Army Corps of Engineers, Baltimore District
Easton Utilities Water Infrastructure Modernization
$13.0M
Town of Greensboro Maryland
Greensboro Regional Wastewater System Expansion Project
$10.6M
Pikesville Armory Foundation - EIN: 85-4196251
Pikesville Armory Redevelopment
$10.0M
700 more projects in Maryland
Including Senate CDS requests for FY2025 and FY2026