Smart Filters locked — Agency, Category, Use Case, and Recipient Type filters are available on trial and paid plans.
Try these searches
Showing enacted projects only. Senate CDS requested data and all project statuses are available on paid plans.
Start free trialShowing top 25 of 433 enacted results · 112,898 total in database (filtered)
Start a 7-day evaluation trial to export projects (50-row lifetime sample)
Congressional earmarks only — CPF & CDS. Not competitive grants. What is this data?
City of Grand Ledge
Funding will be used to expand the wastewater treatment plant and sanitary sewer.
$17.3M
Motown Historical Museum, Inc.
Funding will be used to expand the Motown Museum and create economic development opportunities for residents and local businesses.
$16.0M
Great Lakes Water Authority
Funding would be used to evaluate and rehabilitate the Detroit River Interceptor (DRI), a critical piece of drainage infrastructure built over 100 years ago. The project will address major blockages caused by debris and other large objects that become lodged in the interceptor, reducing its capacity and making the system more vulnerable. Maintaining the DRI in a reliable and efficient operating condition is key to maintaining the Great Lakes Water Authority wastewater system and to mitigating is
$15.0M
Capital Region Airport Authority
Funding will expand the existing cargo ramp at Capital Region International Airport (LAN) to accommodate current and future cargo operations at LAN. The project supports economic development in the region.
$11.9M
Brighton Area Fire Authority
Brighton Area Fire Authority
$10.5M
Macomb County Department of Roads
Funding will be used for the final design of the Mound Road/Detroit Arsenal Connector Project, which is part of a larger project to reconstruct 9 miles of Mound Road from its intersection with Interstate 696 (at 10 Mile Road) to the intersection with State Route M-59.
$10.0M
City of Ann Arbor
Safe, Healthy, and Net Zero Energy Affordable Supportive Housing
$7.5M
Gerald R. Ford International Airport Authority
Funding will be used for the design phase of constructing a new Air Traffic Control Tower at Gerald R. Ford International Airport. The existing tower at the airport is 58 years old, which makes it the second oldest operational tower at a large airport.
$7.0M
Ann Arbor Area Transportation Authority
Ypsilanti Transit Center Design and Construction
$7.0M
Charter Township of Orion
Orion Township Giddings/Silverbell/Brown Road Rehabilitation
$7.0M
Village of Mackinaw City
North Huron Avenue Rejuvenation Project/2021 Road Project
$7.0M
Genesee County Road Commission
Updating Road Infrastructure and Safety Improvements in Genesee County
$6.9M
Tuscarora Township
Funding will be used to expand the existing sewer system.
$6.5M
Hospice of Michigan
Funding will be used for a Caregiver Support Center that will provide 24/7 telephone triage and 24/7 virtual care, as well as a simulation and skill labs for caregivers.
$6.0M
Saginaw Transit Authority Regional Services
Improving Transportation Services for Saginaw Residents
$5.9M
County of Monroe, Michigan
River Raisin Heritage Trail Rehabilitation Project
$5.6M
Jackson YMCA
Funding will be used to build a new Y in downtown Jackson. This new building will lease space to Henry Ford Allegiance Health for diagnostics, therapeutic programs, and chronic disease prevention. Big Brothers Big Sisters will relocate to the new Y. Plans also include programmatic space for other partnerships including Lifeways Community Mental Health and College and Career Access Center.
$5.0M
Macomb County
This funding will support the Mound Road/Detroit Arsenal Connector Project in Macomb County.
$5.0M
City of Saline
Funding will be used to rehabilitate the City of Saline’s Pollution Control Facility (Wastewater Treatment Plant).
$5.0M
Washtenaw County
Eastern Washtenaw Recreation Center
$5.0M
Copper Peak Inc.
Copper Peak Reconstruction and Rehabilitation
$5.0M
City of Lansing
Lansing Ovation Center for Music & Arts
$5.0M
City of Jackson, Michigan
M-50 Water Transmission Main
$5.0M
Jackson YMCA
Jackson YMCA Healthy Living Campus
$4.9M
The Beck Road Business Corridor Improvement Project
The Beck Road Business Corridor Improvement Project
$4.8M
418 more projects match your search
Sign up free and start a trial to unlock all 433 results and CSV export.