Otter Tail County
Architect Bill Hickey with Collaborative Design Group reported in January 2021 that an ongoing Regional Treatment Center (RTC) Reuse Master Plan study commissioned by the City of Fergus Falls reached two major conclusions. First, while affected by lack of occupancy, age, and deferred maintenance, the Kirkbride is structurally sound. Second, based on analysis of reuse options suggested by the community and recommended by the RTC Reuse Master Plan Advisory Committee, the most viable option is to r
$39.0M
Carver County
The US 212 Rural Freight Mobility and Safety Project will expand 5.5 miles of US Highway (US) 212, an existing Principal Arterial roadway, from a rural two-lane undivided highway to a four-lane divided expressway from CSAH 34 in Norwood Young America to CSAH 36 in Cologne and construct Reduced Conflict Intersections (RCIs) and a grade-separated interchange at CSAH 51. This Project will improve the rural transportation system and freight travel by reconstructing the 90-year-old roadway, adding ca
$25.0M
Highway 212 Rural Freight Mobility and Safety: Carver County $25 million
Highway 212 Rural Freight Mobility and Safety: Carver County $25 million
$25.0M
Oslo Region Joint Powers Board
Funds would be used to remove blockages in the Red River channel, including the two bridges that do not accommodate current flow rates, and replacing them with appropriately-sized bridges allows the Red River to flow within its natural channel rather than overflow its banks. Additional protective levees and removal of 40 blockages in the river channel which produce significant reduction in flood occurrences and duration, as shown by recent modeling research by Houston Engineering. In the last 25
$18.0M
Oslo Region Joint Powers Board
"For the 3-Phase project to be successfully implemented, the river flow dictates the first phase of the project must be the replacement of the 1905 built railroad bridge and highway bridge, built in its shadow in the 1950s at Oslo and the water flow restrictions at the Hwy 17/317. A smaller bridge project on ND 54 at the Grand Marais also protects highway access. These bridges cannot accommodate the present-day water flow rates of a high water event. This phase is the highest cost of the proje
$18.0M
City of Fairmont
The funds will be utilized for the construction of the biosolids processing facility at the City's wastewater treatment facility. The planning and design work for this project is complete and the project is shovel ready.
$15.0M
City of Albert Lea
The city will need to update the infrastructure at the Wastewater Treatment Facility (WWTF) to support area industries that produce food while maintaining the city's high standards for improving area natural resources and meeting new NPDES phosphorus limits.
$15.0M
City of Fairmont
The funds will be utilized for the construction of the biosolids processing facility at the City's wastewater treatment facility. The planning and design work for this project is complete and the project is shovel ready.
$15.0M
Carver County Community Development Agency
Trail's Edge Senior is a 76 unit senior housing project for 55 and older located in Waconia. This project will create new affordable housing opportunities for seniors in the area.
$14.7M
Dakota County
Dakota County Regional Household Hazardous Waste and Recycling Facility
$14.0M
Highway 169 North Task Force
TH 169 Spot Safety and Mobility Improvements between TH 1/169 and St. Louis County Road 88 west of Ely (Tower-Soudan to Ely). RP 267 Grade Lowering TH 169 near Soudan - new Vermilion State Park Entrance. RP 275-276 Horizontal Curve Correction. RP 276-278 Wolf Creek Pass Road (Morse Township Road) Turn Lane Construction and Realignment. RP 278-279 Wolf Lake Road (St. Louis County 404) Turn Lanes and TH 169 Realignment. Funds would be used for Preliminary Engineering, Final Engineering, ROW Acquis
$13.0M
City of Hastings
Hastings Western Water Treatment Plant - PFAS and Nitrates Removal
$10.8M
City of Two Harbors
Two Harbors Wastewater Treatment Facility Improvements
$10.0M
City of Mankato
To replace the disinfection system infrastructure for the City of Mankato and nine other customer communities.
$9.2M
City of Mankato
This project provides wastewater service delivery to seven jurisdictions that serve more than 65,000 residents and treat approximately twelve million gallons of effluent per day, in addition to conducting phosphorus trading with three jurisdictions.
$9.2M
Washington County
County Highway 32 Pedestrian and Safety Improvement Project
$9.0M
Chisago County Public Works
US Highway 8 Reconstruction
$8.0M
Fond du Lac Band of Lake Superior Chippewa
The proposed use of the Congressionally Directed funding will be to build a new Law Enforcement and Emergency Management facility for the Fond du Lac Band of Lake Superior Chippewa.
$8.0M
Dakota County
Dakota County I-35 Bridges and CH 50 Interchange Project
$8.0M
Fond du Lac Band of Lake Superior Chippewa
This request is to construct a new law enforcement and emergency management building for the Fond du Lac Band of Lake Superior Chippewa. The current building Fond du Lac Law Enforcement is located in has a number of deficiencies that does not allow the police department officers and staff to effectively or efficiently do their duties. Also, the Emergency Management Division was created in 2017 and has not had a permanent location and needs space to grow and to store the departments equipment.
$8.0M
City of Saint Paul
Funding is needed to complete construction of the North End Community Center, a new 25,000 square foot building with enhancements to the existing 5.6-acre park in Saint Paul's North End neighborhood. This community center will replace the obsolete Rice Recreation Center and provide a modern community hub with amenities requested and needed by the community. The center and parkland sit nestled between the Rice Street Library and the Paul and Sheila Wellstone Elementary School. The project will pr
$8.0M
City of Saint Paul
Funding is needed to complete construction of the North End Community Center, a new 25,000 square foot building with enhancements to the existing 5.6-acre park in Saint Paul’s North End neighborhood. This community center will replace the obsolete Rice Recreation Center and provide a modern community hub with amenities requested and needed by the community. The center and parkland sit nestled between the Rice Street Library and the Paul and Sheila Wellstone Elementary School. The project will
$8.0M
The City of Saint Paul
North End Community Center
$8.0M
City of Saint Paul
Complete renovation of the Riverview Library includes mechanical, electric, plumbing (MEP), windows, lighting, flooring, shelving, service desk, furnishings, staff work areas, restrooms, finishes, community room, maintenance area, technology, and exterior paving, concrete and landscaping.
$7.7M
Minneapolis American Indian Center
Minneapolis American Indian Center All Roads Campaign
$7.6M
671 more projects match your search