Camp Shelby - Mississippi Army National Guard
Constructs a 10 megawatt (MW) natural gas generation plant connected to the installation primary substation, and installs a microgrid control system
$34.5M
Camp Shelby, MS - Mississippi Army National Guard
Constructs a 10 megawatt (MW) natural gas generation plant connected to the installation primary substation, and installs a microgrid control system. The Reciprocating Internal Combustion Engine (RICE) generator plant will provide power to substation feeders during an emergency scenario when the electrical power goes down. The microgrid will provide operational reliability, maintenance sustainability, safety, and intelligent management to critical loads utilizing both new and existing backup gen
$34.5M
N/A
This request would fund the federal share of the Preconstruction Engineering and Design phase for the Pearl River Basin, MS project.
$32.4M
US Army Corps of Engineers
The purpose of this authorized ongoing project is to reduce flood damages to homes, land, roads, bridges and other public infrastructure, as well as address environmental justice and environmental health issues within the Yazoo Backwater Area. Funding above the Budget Request will be used to continue work on the remaining unconstructed features of this ongoing project, which is intended to protect lives, property, and the environment.
$25.0M
US Army Corps of Engineers
This funding would accomplish the $25 million capability expressed by USACE to be executed in FY22 to continue pump design, to award the first contract to pre-load the pump site, to continue NEPA documentation for the Yazoo Backwater Levee to purchase mitigation land for the previously construction levee project.
$25.0M
Mississippi State University
Support for the relocation and construction of the Ulysses S. Grant Presidential Library.
$20.0M
N/A
The purpose of this request is to provide design and construction assistance to water-related environmental infrastructure projects in Mississippi authorized under Section 219 of the Water Resources Development Act of 1992, as amended.
$18.0M
U.S. Army Corps of Engineers Vicksburg District
The purpose of the Mississippi Environmental Infrastructure Program (section 592) is to provide communities throughout the State of Mississippi with design and construction assistance for improvements to water and wastewater systems, and related facilities.
$17.3M
Mobilization and Annual Training Equipment Site (MATES) Project
Mobilization and Annual Training Equipment Site (MATES) Project
$16.0M
Camp Shelby, MS - Mississippi Army National Guard
Construct 52,495 SQFT MATES Addition at Camp Shelby MS, an ARNG MFGI. Project will provide 12 General Purpose Bays that support maintenance of M1 Family Vehicles in a safe and efficient manner. Current facility is short of space and inadequately configured to fully support maintenance of M1/M2/M88 vehicles. REF# 281703 (PAX# 92269 )
$15.5M
Camp Shelby - Mississippi Army National Guard
Construct 52,495 SQFT MATES addition at Camp Shelby MS, an ARNG MFGI.
$15.5M
US Army Corps of Engineers
The purpose of this authorized ongoing project is to provide flood control, environmental, water quality, and sediment reduction benefits in the eastern hill section of the Yazoo River Basin. Without adequate funding, land will continue to erode, towns and farms will continue to flood, and existing federal investments will fall into disrepair.
$15.0M
US Army Corps of Engineers
The purpose of this authorized ongoing project is to provide flood reduction and economic benefits to 29,000 residents living within the 100-year floodplain.
$14.0M
City of Greenville
To fund wastewater system improvements in the City of Greenville.
$13.2M
Camp Shelby, MS - Mississippi Army National Guard
Hardens the electrical distribution system by placing the entire system underground to include feeder #5066 and initial sections of feeders #5026, and #5036. In addition, installs back-up generators to nine (9) identified mission critical facilities. Completion of this project will result in hardening 40% of the critical mission facilities against interruptions to the electrical distribution grid.
$11.2M
Camp Shelby - Mississippi Army National Guard
Hardens the electrical distribution system by placing the entire system underground.
$11.2M
Army Corps of Engineers (Civil)
Funding to support authorized channel improvement and bank stabilization features of the Upper Yazoo Projects.
$10.5M
Town of Mathiston
Town of Mathiston- Water System Improvements
$10.0M
City of Meridian
City of Meridian, Mississippi, Environmental Infrastructure
$10.0M
Harrison County
This project improves an Interstate 10 interchange in Harrison County to enhance the safety, efficiency, reliability, and overall traffic operations through the area, while providing a catalyst for future economic growth.
$10.0M
Madison County Board of Supervisors
Bozeman-Reunion Crossing Interconnectivity System for Madison County, Mississippi, MS-03
$10.0M
Yazoo Basin, Grenada Lake, MS U.S. Army Corps of Engineers
Yazoo Basin, Grenada Lake, MS U.S. Army Corps of Engineers
$10.0M
Oktibbeha County Hospital
Replace technology to improve the quality of care in a small rural community hospital.
$9.5M
Army Corps of Engineers (Civil)
To fund enlargement of existing project features and mitigation requirements associated with the Yazoo Basin, Yazoo Backwater Area Project.
$9.0M
Coastal Railroad Rehabilitation and Velocity Improvement Project
Coastal Railroad Rehabilitation and Velocity Improvement Project
$9.0M
377 more projects match your search