House CPF & Senate CDS · FY2022–FY2026
Try these searches
Showing enacted projects only. Senate CDS requested data and all project statuses are available on paid plans.
Start free trialShowing top 25 of 1,131 enacted results · 97,761 total in database (filtered)
Start a free 7-day trial to export projects to CSV (up to 50 rows)
Congressional earmarks only — CPF & CDS. Not competitive grants. What is this data?
Western Mesabi Mine Planning Board
U.S. Highway 169, known as the Cross Range Expressway, is the primary freight and passenger highway connection between Grand Rapids, Hibbing, and Virginia. This seventy mile distance was completed to a four lane divided highway between the 1960s and 1994, except for approximately 9.5 miles between Coleraine and Pengilly which was left as two lane undivided highway. Four miles were completed more recently, still leaving 8.4 miles of undivided two lane highway sandwiched between four lane divided
$150.0M
ReConnect Rondo
ReConnect Rondo recognizes there to be a wide range of funding needs for this project. Project Development Activities: Funds to be used for planning phase to identify needs, issues and alternatives to determine critical elements, including equity in transportation outcomes (social, economic, environmental) allowing for important and necessary analysis and environmental screening; project management, area planning and design, project assessment, market research, financial evaluation, community ou
$80.0M
Oslo Region Joint Powers
The Red River of the North, bordering MN and ND, is extremely susceptible to spring and summer flooding events, overtopping roads and rail transportation, and inundating farmland. This disrupts traffic by closing I-29 and all highway access through Oslo, MN on MN Hwy 1, and to ND Hwy 54, a trunk highway connecting northern Minnesota to I-29. The floods also halts rail commerce and the delivery of agricultural products to market. Project includes reductions to the overbank upstream from Oslo to r
$60.8M
Oslo Region Joint Powers Board
The Red River of the North, bordering MN and ND, is extremely susceptible to spring and summer flooding events, overtopping roads and rail transportation and inundating farmland. This disrupts traffic by closing I-29 and all highway access through Oslo, MN on MN Hwy 1, and to ND Hwy 54, a trunk highway connecting northern Minnesota to I-29, as well as rail commerce delivering agricultural products to market. In the last 25 years, there have been 13 major flood events. The city of Oslo and far
$60.8M
City of Burnsville
I-494: Airport to Highway 169, is a 9.5 mile reconstruction of Interstate 494 (I-494) to increase capacity and improve safety along the interstate to better serve the growing freight and multimodal needs of the region. The goals of the Project are to address traffic mobility in the freight corridor, improve safety by reducing the high crash rates, preserve infrastructure and increase sustainability by restoring pavement and replacing/preserving existing bridges, and provide an improved and eq
$50.0M
City of Bloomington
The I-494 improvement project from MSP Airport to HWY 169, is a 9.5 mile reconstruction of interstate 494 to increase mobility and improve safety along the interstate to better serve the growing freight and multimodal needs to the region. This stretch of 494 provides direct access to major destinations such as the Minneapolis-St. Paul International Airport and the Mall of America, cross metro access for commuters and freight, and local access for the numerous businesses and residents along the f
$50.0M
City of Bloomington Minnesota
The I-494 improvement project from MSP Airport to HWY 169, is a 9.5 mile reconstruction of interstate 494 to increase mobility and improve safety along the interstate to better serve the growing freight and multimodal needs to the region. This stretch of 494 provides direct access to major destinations such as the Minneapolis-St. Paul International Airport and the Mall of America, cross metro access for commuters and freight, and local access for the numerous businesses and residents along the f
$50.0M
US Army Corps of Engineers
FY 22 funds would allow for immediately constructing small-scale navigation efficiency improvements and ecosystem restoration projects that will provide tremendous ecological and economic benefits to the region as well as complete design work for at least one new 1,200-foot lock chamber to begin modernizing the system. Ecosystem restoration measures would occur in all five Upper Mississippi Basin states. The U.S. Army Corps of Engineers estimates the creation of nearly 50 million man-hours of
$45.1M
U.S. 169/4 Interchange: $44 Million
U.S. 169/4 Interchange: $44 Million
$44.0M
Detroit Lakes Public Utilities
This facility will provide renewable energy to 3200 homes. This will allow less capacity to serve local load and increase the probabilities of reliability related outages and poor power quality. The combination of solar with Energy Storage System (ESS) back up can stabilize the grid in a clean and environmentally responsible manner.
$42.1M
City of Detroit Lakes
The project would fund the installation of 8 Megawatts of solar generation and 8 megawatts of batter energy storage system to replace 10 megawatts of diesel powered generation, to be made available to customers of Detroit Lakes Public Utilities.
$42.1M
City of Blaine, MN
The Trunk Highway (TH) 65 Improvements Project (Project) will improve the flow of traffic, expand access for multiple modes of transportation, and improve safety along 2 miles through the City of Blaine by improving several interchanges, adding frontage roads, as well as safe bike and pedestrian passage
$40.7M
City of Blaine, MN
The Trunk Highway (TH) 65 Improvements Project (Project) will improve the flow of traffic, expand access for multiple modes of transportation, and improve safety along 2 miles through the City of Blaine by improving several interchanges, adding frontage roads, as well as safe bike and pedestrian passage.
$40.7M
Minnesota Bureau of Criminal Apprehension
The Minnesota Bureau of Criminal Apprehension(BCA) is the state's criminal investigative agency providing law enforcement services, criminal justice records, and forensic laboratory services to all 87 counties within Minnesota as well our other partners at the local, state, and federal levels. Services provided by the BCA include providing investigative assistance in complex proactive and reactive criminal investigations, laboratory analysis, criminal history record keeping, and training through
$40.0M
City of Fergus Falls
Architect Bill Hickey with Collaborative Design Group reported in January 2021 that an ongoing Regional Treatment Center (RTC) Reuse Master Plan study commissioned by the City of Fergus Falls reached two major conclusions. First, while affected by lack of occupancy, age, and deferred maintenance, the Kirkbride is structurally sound. Second, based on analysis of reuse options suggested by the community and recommended by the RTC Reuse Master Plan Advisory Committee, the most viable option is t
$39.6M
Otter Tail County
Early results of an ongoing Reuse Master Plan study commissioned by the City of Fergus Falls indicate the most viable option to extend the life of the historic Kirkbride complex is to redevelop and retrofit the east and west wings as housing for a mix of market segments that are currently underserved in Fergus Falls and greater Otter Tail county, including market rate, affordable, low-income, Senior, Veteran, and supported housing.
$39.0M
Kirkbride Preservation and Rehabilitation
The proposed use of federal funds would encompass the following in order to spur development of housing and associated reuse: Site Costs, Walks, drives, landscaping, visitor parking Parking - 3 units, 2 level structured for residents, as well as Building Infrastructure (Mechanical and electrical systems, elevators, life safety systems), Building Envelope (Roofs, masonry walls windows, doors Building Interior), general repair and upgrades, and restoration of key features.
$39.0M
Minnesota Bureau of Criminal Apprehension
This proposal is for an expansion of an existing Minnesota Bureau of Criminal Apprehension (BCA) Bemidji Regional Facility which is expected to expand the building from approximately 25,000 to 50,000 square feet. It would house personnel from the various divisions within the BCA including Investigations, the Forensic Science Services, and Minnesota Justice Information Services (MNJIS). Funding would be required for design, renovation, new construction and supplying the facility with the necessar
$38.0M
Minnesota Bureau of Criminal Apprehension
The Minnesota Bureau of Criminal Apprehension (BCA) is the state's criminal investigative agency providing law enforcement services, investigative assistance in complex proactive and reactive criminal investigations, forensic laboratory analysis, criminal justice records, and training to all 87 counties within Minnesota as well our other partners at the local, state, and federal levels. The BCA currently operates from two primary locations in the state. BCA headquarters is located in Saint Paul
$38.0M
City of Maple Grove
The Highway 610 Extension Project will complete the long-sought Highway 610 corridor which has been planned, designed, and constructed over the last 50 years beginning with a preliminary study in 1973. The Project will improve regional mobility and roadway safety with the construction of the Highway 610 segment that will connect the existing County Road 30 to Trunk Highway (TH) 610 via bridges over Interstate 94 (I-94). The project will also complete the unfinished system interchange at I-94 and
$33.9M
City of Maple Grove
The Highway 610 Extension Project will complete the long-sought Highway 610 corridor which has been planned, designed, and constructed over the last 50 years beginning with a preliminary study in 1973. The Project will improve regional mobility and roadway safety with the construction of the Highway 610 segment that will connect the existing County Road 30 to Trunk Highway (TH) 610 via bridges over Interstate 94 (I-94). The project will also complete the unfinished system interchange at I-94 and
$33.9M
Oslo Region Joint Powers Board
The Red River of the North, bordering MN and ND, is extremely susceptible to spring and summer flooding events, overtopping roads and rail transportation and inundating farmland.
$29.4M
Oslo Region Flood Mitigation
This proposal would fund flood mitigation efforts in the Oslo Region of Minnesota.
$29.4M
Nexus Family Healing
Nexus Family Healing requests funds to take ownership of an existing state of the art mental health facility, which is currently in the midst of closure by its parent organization, and develop it into a multipurpose Mental Health Center to meet the most pressing mental health needs in the region. Specifically, capital funding would be used to fulfill an existing outstanding bond debt on the building and support start-up expenses related to the development of the Mental Health Hub, including hiri
$29.0M
City of Austin
Southern Minnesota is a leading producer of crops and livestock production for our State. Hormel Foods and the broader region is a inextricably linked to agriculture and it is clear Austin and southern Minnesota is not the same without this Fortune 500 company and specifically their flagship plant. SPAM is a worldwide product made in the heart of the 1st Congressional and this business supports 3,000 direct jobs and 1,600 indirect jobs in and around the region. This is a major financial impact i
$28.5M
1,116 more projects match your search