Search this agency →This project constructs adequate and properly configured operational and maintenance facilities required for the F-35 beddown at MCAS Miramar, as the Marines transition from the F/A-18 to F-35 aircraft in support of the Marine Corps Aviation Plan, operational training and maintenance requirements, planned deployment schedules, and overall flexibility of aviation assets and facilities.
Dianne Feinstein
Constructs a low-rise hangar complex to support the RDT&E of MQ-25 and E-2D composite squadrons with an initial operational capability (IOC) in 2024, and the first Optimized Fleet Response Plan (OFRP) cycle on Commander, U.S. Pacific Fleet (CPF) aircraft carrier (CVN) in 2025. There are no existing hangars or other facilities to support this mission and this project is necessary to meet IOC in 2024 and OFRP support to carrier operations in FY25.
Dianne Feinstein
Planning and Design for Basing of the E-4C Survivable Operations Center (SAOC) at Offutt AFB, NE
Don Bacon
Constructs an aircraft maintenance hangar with applied instructional space, multi-story parking facility, operations support spaces, and a hangar shop annex to support the F-35 training squadron at MCAS Beaufort.
Lindsey Graham
Project provides the required enlisted personnel housing units to accommodate personnel stationed at Marine Corps Base-Hawaii. The new Bachelor Enlisted Quarters will provide 95 rooms in the standard 2+0 room configuration. Replaces aging existing quarters built in the 1970s which need continuous repair and maintenance in order to maintain minimum habitability.
Mazie Hirono
Bachelor Enlisted Quarters, MCAS Yuma: This funding would allow for construction of a much-needed new multi-story Bachelor Enlisted Quarters, including 304 rooms to house 608 Marines, requiring parking facilities, and recreation facilities for permanent enlisted personnel. These billeting quarters at MCAS Yuma would help maintain unit integrity by avoiding either housing personnel in unsafe billets or housing them off base.
Kyrsten Sinema
Bachelor Enlisted Quarters, MCAS Yuma: This funding would allow for construction of a much-needed new multi-story Bachelor Enlisted Quarters, including 304 rooms to house 608 Marines, requiring parking facilities, and recreation facilities for permanent enlisted personnel. These billeting quarters at MCAS Yuma would help maintain unit integrity by avoiding either housing personnel in unsafe billets or housing them off base.
Mark Kelly
Project provides an adequately sized and configured dining facility to support the recruit population and support personnel at MCRD San Diego. The new facility includes mess decks, galley, scullery, administrative offices, chill boxes and freezers, storage, and heads. A suitable and sizeable recruit mess hall is critical to the recruit training mission as a recruit barracks, since recruits do not have other available dining options. The recruit mess hall is the one facility aboard MCRD S
Dianne Feinstein
Basilone Road is the main North-South road on base connecting the northern, central and southern parts of Camp Pendleton and currently does not meet safety standards. This main corridor is the second most important road on Base with an average of over 10,000 vehicles in a 24 hour period of time. Northern camps, including San Onofre, Horno, San Mateo, and Las Pulgas, are interconnected by this road to the southern part of the Base including the Marine Corps Air Station, Chappo and Headqua
Dianne Feinstein
Funding for construction of an aviation operations building at Wheeler Army Airfield.
Brian Schatz