Smart Filters locked — Agency, Category, Use Case, and Recipient Type filters are available on trial and paid plans.
Try these searches
Showing enacted projects only. Senate CDS requested data and all project statuses are available on paid plans.
Start free trialShowing top 25 of 768 enacted results · 112,898 total in database (filtered)
Start a 7-day evaluation trial to export projects (50-row lifetime sample)
Congressional earmarks only — CPF & CDS. Not competitive grants. What is this data?
U.S. Army Corps of Engineers
Full FY24 Funding for Soo Lock Project
$394.1M
City of Grand Ledge
City of Grand Ledge Wastewater Treatment Plant and Sanitary Sewer System Improvements
$17.3M
City of Grand Ledge
Funding will be used to expand the wastewater treatment plant and sanitary sewer.
$17.3M
Motown Historical Museum, Inc.
Funding will be used to expand the Motown Museum and create economic development opportunities for residents and local businesses.
$16.0M
Great Lakes Water Authority
Funding would be used to evaluate and rehabilitate the Detroit River Interceptor (DRI), a critical piece of drainage infrastructure built over 100 years ago. The project will address major blockages caused by debris and other large objects that become lodged in the interceptor, reducing its capacity and making the system more vulnerable. Maintaining the DRI in a reliable and efficient operating condition is key to maintaining the Great Lakes Water Authority wastewater system and to mitigating is
$15.0M
Capital Region Airport Authority
Funding will expand the existing cargo ramp at Capital Region International Airport (LAN) to accommodate current and future cargo operations at LAN. The project supports economic development in the region.
$11.9M
Brighton Area Fire Authority
Brighton Area Fire Authority
$10.5M
City of Ypsilanti
Cross Street and Prospect Street Bridge Rehabilitation
$10.5M
Oakland County
Oakland County/Northern Border Patrol Helicopter
$10.0M
City of Novi
Novi Public Safety Program
$10.0M
Macomb County Department of Roads
Funding will be used for the final design of the Mound Road/Detroit Arsenal Connector Project, which is part of a larger project to reconstruct 9 miles of Mound Road from its intersection with Interstate 696 (at 10 Mile Road) to the intersection with State Route M-59.
$10.0M
City of Mackinac Island Department of Public Works
Mackinac Island FY 2024 Drinking Water Asset Management Plan
$9.6M
Fruitland Township
North Scenic Drive Non-Motorized Pathway
$9.1M
City of Romulus
City of Romulus – Romulus Community Service Road Infrastructure Project
$8.9M
Capital Region Airport Authority
To support the replacement of passenger boarding bridges to ensure safe, reliable, and efficient access between aircraft and the terminal building.
$8.2M
Lansing Capital Region International Airport
New Jet Bridges at Lansing Capital Region Airport
$8.2M
City of Wyandotte Department of Municipal Services
City of Wyandotte Lead Service Line Replacement
$8.2M
City of Detroit Airport (Coleman A. Young Airport KDET)
City of Detroit Airport Construction of Taxiway B
$8.1M
City of Birmingham, Michigan
Birmingham Senior/Recreation Center
$8.0M
City of Ann Arbor
Safe, Healthy, and Net Zero Energy Affordable Supportive Housing
$7.5M
Meridian Charter Township Downtown Development Authority
Village of Okemos Affordable Housing and Mixed-Use Development
$7.5M
City of Muskegon Heights
Broadway Avenue Reconstruction & Streetscape – Phase II
$7.4M
Clinton County Road Commission
Chandler Road - Coleman Road to Stoll Road
$7.0M
Ann Arbor Area Transportation Authority
Ypsilanti Transit Center Design and Construction
$7.0M
Kent County
Grand River Greenway Trail Connection
$7.0M
753 more projects match your search
Sign up free and start a trial to unlock all 768 results and CSV export.