Showing a preview of the top 3 enacted projects. Sign up free or start a free 7-day trial for full funding history.
Lobbying & Representation Intelligence
FFID tracks federal lobbying activity associated with earmark recipients from public LDA filings — see which firms lobbied on behalf of this organization, which issue codes they filed under, and which agencies they contacted.
Upgrade to see lobbying intelligence →Top 3 Projects — Preview
Edgewater Creek Bridge Replacement, Everett, Washington (WA-02)
$4.5M
Everett Point Industrial Center (EPIC) Green Bridge, Everett, Washington (WA-02)
$3.0M
The project would replace the current Edgewater bridge built in 1946 that is at the end of its useful life. While safe for daily use, it is functionally obsolete, structurally deficient, and currently operates under load restrictions. The replacement will meet modern seismic safety standards and have one 12-foot vehicle lane and one 5-foot bike lane in each direction with 6.5-foot sidewalks, wider than the existing sidewalks.
$3.0M
2 more projects hidden
Start a free 7-day trial to see the full funding history across all fiscal years.
Start free trialOr sign up free →Multi-Year Funding History
FY2026
$4.6M
FY2025
$21.0M
FY2024
$17.4M
FY2023
$2.2M
FY2022
$3.3M