Showing a preview of the top 3 enacted projects. Sign up free or start a free 7-day trial for full funding history.
Lobbying & Representation Intelligence
FFID tracks federal lobbying activity associated with earmark recipients from public LDA filings — see which firms lobbied on behalf of this organization, which issue codes they filed under, and which agencies they contacted.
Upgrade to see lobbying intelligence →Top 3 Projects — Preview
The Ely Downtown Upgrade Project would fund upgrades in downtown Ely by Nevada Department of Transportation (NDOT), including improving most storm drains to NDOT design standards and installing a major storm drain from the Courthouse Park to where Murry Creek crosses the railroad. This improvement to the system would reduce significantly and/or prevent completely any flooding in these areas from water events that previously would have resulted in flooding.
$26.0M
The Ely Downtown Upgrade Project would fund upgrades in downtown Ely by Nevada Department of Transportation (NDOT), including improving most storm drains to NDOT design standards and installing a major storm drain from the Courthouse Park to where Murry Creek crosses the railroad. This improvement to the system would reduce significantly and/or prevent completely any flooding in these areas from water events that previously would have resulted in flooding.
$26.0M
Infrastructure improvements to comply with new stringent environmental regulations (discharge standards to Waters of the State) as well as expansion of the WWTF flow capacity to manage peak flow events that require a new filtration system capable of meeting effluent permit requirements.
$7.4M
13 more projects hidden
Start a free 7-day trial to see the full funding history across all fiscal years.
Start free trialOr sign up free →Multi-Year Funding History
FY2026
$34.9M
FY2025
$35.7M
FY2024
$27.6M
FY2023
$26.3M
FY2022
$82.6M