City of Oak Ridge
The City of Oak Ridge (City) is seeking $6.5 million in programmatic funding to support the construction of a new water transmission main associated with the construction of the City\u2019s new 16 million gallon per day (MGD) water treatment plant (WTP). The facility will replace an outdated 28 MGD plant that was constructed in the early 1940s by the federal government. Funding can be obligated within federal FY2023, as the design for the new water treatment plant, including the transmission line, is shovel ready for bidding and construction. The existing plant was transferred to the City in 2000, and over the past several years has deteriorated significantly despite the City\u2019s investment of more than $7 million in repairs since assuming ownership. The City commissioned a detailed cost-benefit analysis in 2016, and concluded that construction of a new, right-sized energy-efficient facility outweighed escalating compliance costs associated with rehabilitation of the outmoded facility.\n\nThe $6.5 million request will support a significant component of the project, the new water transmission main linking the WTP to the City\u2019s water distribution system. The transmission pipeline consists of approximately 2,500 linear feet of 36-inch and 11,500 linear feet of 30-inch restrained joint ductile iron water pipeline and will connect the new WTP to the City\u2019s existing water storage tanks. This portion of the overall $55 Million WTP project is estimated to cost $10M to construct.
Amount Appropriated
$5.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The City of Oak Ridge (City) is seeking $6.5 million in programmatic funding to support the construction of a new water transmission main associated with the construction of the City\u2019s new 16 million gallon per day (MGD) water treatment plant (WTP). The facility will replace an outdated 28 MGD plant that was constructed in the early 1940s by the federal government. Funding can be obligated within federal FY2023, as the design for the new water treatment plant, including the transmission line, is shovel ready for bidding and construction. The existing plant was transferred to the City in 2000, and over the past several years has deteriorated significantly despite the City\u2019s investment of more than $7 million in repairs since assuming ownership. The City commissioned a detailed cost-benefit analysis in 2016, and concluded that construction of a new, right-sized energy-efficient facility outweighed escalating compliance costs associated with rehabilitation of the outmoded facility.\n\nThe $6.5 million request will support a significant component of the project, the new water transmission main linking the WTP to the City\u2019s water distribution system. The transmission pipeline consists of approximately 2,500 linear feet of 36-inch and 11,500 linear feet of 30-inch restrained joint ductile iron water pipeline and will connect the new WTP to the City\u2019s existing water storage tanks. This portion of the overall $55 Million WTP project is estimated to cost $10M to construct.
Sponsoring Member
Charles Fleischmann
Representative · TN
See every project Charles Fleischmann has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
City of Oak Ridge
This recipient has 1 other project funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- water infrastructure
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/fb0e8907-2b5a-4d0a-b353-075824099705" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
City of Oak Ridge
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.