Skip to main content
Back to search

The City of Raton

The City of Raton proposes to rehabilitate Kearny Elementary School into a film production and workforce development facility. The school was constructed in the 1930's and was closed in 2016. The facility includes an approximate 20000 square foot building complex located on a 2.25 acre tract, currently owned by the City of Raton. The facility will provide training in all areas and trades associated with film production in partnership with Santa Fe Community College and El Raton Media Works. Funding is sought for facility renovation and studio-related equipment.\n1. Raton has experienced economic decline over a 17 year period due to loss of coal mining and other base industries and employers. Current census data indicates that 26.6% of Raton residents live in poverty. The project is proposed to provide economic opportunity to students, residents and improve the local economic base. The project is anticipated to expand local economic opportunities, principally for low- and moderate-income persons.\n 2. As a result of the decline, Raton has experienced significant slum and blight impacts. The project would renovate a large school building that has been vacant since 2016. The project is anticipated to catalyze housing improvements and commercial facility utilization.\n 3. Raton has experienced declining student population and graduation rates, and reduced school funding from the State of New Mexico. The project is intended to foster a range of local career opportunities associated with film production and improve education metrics in Raton and the region.\n\nCurrently, the City of Raton owns Kearny Elementary School. The intent is for the non-profit, El Raton Media Works (EIN: 87-2570544), to enter into a Local Economic Development Agreement for use and management of the facility. Ownership will stay with the City of Raton for years to come. If ownership were to change, it would be in conjunction with the non-profit for workforce development, not a for-profit entity.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The City of Raton proposes to rehabilitate Kearny Elementary School into a film production and workforce development facility. The school was constructed in the 1930's and was closed in 2016. The facility includes an approximate 20000 square foot building complex located on a 2.25 acre tract, currently owned by the City of Raton. The facility will provide training in all areas and trades associated with film production in partnership with Santa Fe Community College and El Raton Media Works. Funding is sought for facility renovation and studio-related equipment.\n1. Raton has experienced economic decline over a 17 year period due to loss of coal mining and other base industries and employers. Current census data indicates that 26.6% of Raton residents live in poverty. The project is proposed to provide economic opportunity to students, residents and improve the local economic base. The project is anticipated to expand local economic opportunities, principally for low- and moderate-income persons.\n 2. As a result of the decline, Raton has experienced significant slum and blight impacts. The project would renovate a large school building that has been vacant since 2016. The project is anticipated to catalyze housing improvements and commercial facility utilization.\n 3. Raton has experienced declining student population and graduation rates, and reduced school funding from the State of New Mexico. The project is intended to foster a range of local career opportunities associated with film production and improve education metrics in Raton and the region.\n\nCurrently, the City of Raton owns Kearny Elementary School. The intent is for the non-profit, El Raton Media Works (EIN: 87-2570544), to enter into a Local Economic Development Agreement for use and management of the facility. Ownership will stay with the City of Raton for years to come. If ownership were to change, it would be in conjunction with the non-profit for workforce development, not a for-profit entity.

Recipient Organization

The City of Raton

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
education stem classroom

Found an error in this record?

Report a data error
Technical & source detail
Record ID
f6291c1e-3c53-4f84-824b-7c3a92346b2a

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/f6291c1e-3c53-4f84-824b-7c3a92346b2a" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

TF

Teresa Leger Fernandez

D · NM · District NM-03

(202) 225-6190

Confirmed from FFID congressional source

TR

The City of Raton

Grant recipient

Confirmed from FFID source

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.