The City of Raton
The City of Raton proposes to rehabilitate Kearny Elementary School into a film production and workforce development facility. The school was constructed in the 1930's and was closed in 2016. The facility includes an approximate 20000 square foot building complex located on a 2.25 acre tract, currently owned by the City of Raton. The facility will provide training in all areas and trades associated with film production in partnership with Santa Fe Community College and El Raton Media Works. Funding is sought for facility renovation and studio-related equipment.\n1. Raton has experienced economic decline over a 17 year period due to loss of coal mining and other base industries and employers. Current census data indicates that 26.6% of Raton residents live in poverty. The project is proposed to provide economic opportunity to students, residents and improve the local economic base. The project is anticipated to expand local economic opportunities, principally for low- and moderate-income persons.\n 2. As a result of the decline, Raton has experienced significant slum and blight impacts. The project would renovate a large school building that has been vacant since 2016. The project is anticipated to catalyze housing improvements and commercial facility utilization.\n 3. Raton has experienced declining student population and graduation rates, and reduced school funding from the State of New Mexico. The project is intended to foster a range of local career opportunities associated with film production and improve education metrics in Raton and the region.\n\nCurrently, the City of Raton owns Kearny Elementary School. The intent is for the non-profit, El Raton Media Works (EIN: 87-2570544), to enter into a Local Economic Development Agreement for use and management of the facility. Ownership will stay with the City of Raton for years to come. If ownership were to change, it would be in conjunction with the non-profit for workforce development, not a for-profit entity.
Amount Appropriated
$3.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The City of Raton proposes to rehabilitate Kearny Elementary School into a film production and workforce development facility. The school was constructed in the 1930's and was closed in 2016. The facility includes an approximate 20000 square foot building complex located on a 2.25 acre tract, currently owned by the City of Raton. The facility will provide training in all areas and trades associated with film production in partnership with Santa Fe Community College and El Raton Media Works. Funding is sought for facility renovation and studio-related equipment.\n1. Raton has experienced economic decline over a 17 year period due to loss of coal mining and other base industries and employers. Current census data indicates that 26.6% of Raton residents live in poverty. The project is proposed to provide economic opportunity to students, residents and improve the local economic base. The project is anticipated to expand local economic opportunities, principally for low- and moderate-income persons.\n 2. As a result of the decline, Raton has experienced significant slum and blight impacts. The project would renovate a large school building that has been vacant since 2016. The project is anticipated to catalyze housing improvements and commercial facility utilization.\n 3. Raton has experienced declining student population and graduation rates, and reduced school funding from the State of New Mexico. The project is intended to foster a range of local career opportunities associated with film production and improve education metrics in Raton and the region.\n\nCurrently, the City of Raton owns Kearny Elementary School. The intent is for the non-profit, El Raton Media Works (EIN: 87-2570544), to enter into a Local Economic Development Agreement for use and management of the facility. Ownership will stay with the City of Raton for years to come. If ownership were to change, it would be in conjunction with the non-profit for workforce development, not a for-profit entity.
Sponsoring Member
Teresa Leger Fernandez
Representative · NM
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- education stem classroom
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/f6291c1e-3c53-4f84-824b-7c3a92346b2a" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Teresa Leger Fernandez
D · NM · District NM-03
Confirmed from FFID congressional source
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.