On behalf of Kearns Metro Township, I am requesting $3.2 million for phase 3 of the 4700 South roadway reconstruction project. 4700 South is classified as a principal arterial roadway for Kearns and West Valley and is designated as a bike route. The road condition has completely deteriorated and a full reconstruction is required in order to safely provide use of the road. As a joint project with Kearns Metro Township and West Valley City, 4700 South is being reconstructed and widened for bike lanes and to increase vehicle capacity from 4000 West to 5600 West in 3 phases. Phase 1 is nearing the end of construction (estimated completion, May 2022). Phase 2 includes the majority of the length of the project and has been partially funded with federal dollars through UDOT. Phase 2 was advertised to bid in April 2022, with construction expected to begin summer 2022 and extend through summer 2023. Phase 3 includes the portion from 5600 West to 5430 West, including reconstruction and widening of an at grade Union Pacific Railroad crossing. Phase 3 design is complete and coordination with UPRR is ongoing. We expect construction on phase 3 will begin in spring 2023 and be complete by late summer 2023. Phase 3 is an essential piece of the project and federal funding would be a great aid in ensuring that the project can be completed.
Amount Appropriated
$2.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
On behalf of Kearns Metro Township, I am requesting $3.2 million for phase 3 of the 4700 South roadway reconstruction project. 4700 South is classified as a principal arterial roadway for Kearns and West Valley and is designated as a bike route. The road condition has completely deteriorated and a full reconstruction is required in order to safely provide use of the road. As a joint project with Kearns Metro Township and West Valley City, 4700 South is being reconstructed and widened for bike lanes and to increase vehicle capacity from 4000 West to 5600 West in 3 phases. Phase 1 is nearing the end of construction (estimated completion, May 2022). Phase 2 includes the majority of the length of the project and has been partially funded with federal dollars through UDOT. Phase 2 was advertised to bid in April 2022, with construction expected to begin summer 2022 and extend through summer 2023. Phase 3 includes the portion from 5600 West to 5430 West, including reconstruction and widening of an at grade Union Pacific Railroad crossing. Phase 3 design is complete and coordination with UPRR is ongoing. We expect construction on phase 3 will begin in spring 2023 and be complete by late summer 2023. Phase 3 is an essential piece of the project and federal funding would be a great aid in ensuring that the project can be completed.
Sponsoring Member
Burgess Owens
Representative · UT
See every project Burgess Owens has sponsored, broken out by fiscal year and status.
Start 7-day trial →You hit 2 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/efbe7cc5-1682-4a9a-957c-c3aaf5ecf557" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Kearns Metro Township
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.