Kearns Metro Township

On behalf of Kearns Metro Township, I am requesting $3.2 million for phase 3 of the 4700 South roadway reconstruction project. 4700 South is classified as a principal arterial roadway for Kearns and West Valley and is designated as a bike route. The road condition has completely deteriorated and a full reconstruction is required in order to safely provide use of the road. As a joint project with Kearns Metro Township and West Valley City, 4700 South is being reconstructed and widened for bike lanes and to increase vehicle capacity from 4000 West to 5600 West in 3 phases. Phase 1 is nearing the end of construction (estimated completion, May 2022). Phase 2 includes the majority of the length of the project and has been partially funded with federal dollars through UDOT. Phase 2 was advertised to bid in April 2022, with construction expected to begin summer 2022 and extend through summer 2023. Phase 3 includes the portion from 5600 West to 5430 West, including reconstruction and widening of an at grade Union Pacific Railroad crossing. Phase 3 design is complete and coordination with UPRR is ongoing. We expect construction on phase 3 will begin in spring 2023 and be complete by late summer 2023. Phase 3 is an essential piece of the project and federal funding would be a great aid in ensuring that the project can be completed.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

On behalf of Kearns Metro Township, I am requesting $3.2 million for phase 3 of the 4700 South roadway reconstruction project. 4700 South is classified as a principal arterial roadway for Kearns and West Valley and is designated as a bike route. The road condition has completely deteriorated and a full reconstruction is required in order to safely provide use of the road. As a joint project with Kearns Metro Township and West Valley City, 4700 South is being reconstructed and widened for bike lanes and to increase vehicle capacity from 4000 West to 5600 West in 3 phases. Phase 1 is nearing the end of construction (estimated completion, May 2022). Phase 2 includes the majority of the length of the project and has been partially funded with federal dollars through UDOT. Phase 2 was advertised to bid in April 2022, with construction expected to begin summer 2022 and extend through summer 2023. Phase 3 includes the portion from 5600 West to 5430 West, including reconstruction and widening of an at grade Union Pacific Railroad crossing. Phase 3 design is complete and coordination with UPRR is ongoing. We expect construction on phase 3 will begin in spring 2023 and be complete by late summer 2023. Phase 3 is an essential piece of the project and federal funding would be a great aid in ensuring that the project can be completed.

Recipient Organization

Kearns Metro Township

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
efbe7cc5-1682-4a9a-957c-c3aaf5ecf557

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/efbe7cc5-1682-4a9a-957c-c3aaf5ecf557" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

BO

Burgess Owens

R · UT · District UT-04

(202) 225-3011

Confirmed from FFID congressional source

KT

Kearns Metro Township

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.