Central Baptist Community Development Corporation
The long-vacant church building at 10 th & Lombard in the Eastside neighborhood will be redeveloped to include at least five affordable, high quality apartments, and a high quality affordable five unit apartment building on adjacent parking lot. We've already completed renovation of the former parsonage, and two affordable apartments are rented. This project will address two serious problems \u2013 lack of quality affordable rentals to serve rent-burdened residents, and far too many vacant buildings that blight the neighborhood.\n\nThe project will remove the safety hazards and blight of a deteriorating vacant building on 10th St., a busy through street in Downtown Wilmington. The project will also return the property to productive use and results in transformation of the 900 block of Lombard and 10th St between Lombard and Pine Streets. The overall project will result in a minimum of 12 high-quality affordable rentals, completed in three phases. In the first phase, five unit affordable apartment buildings will be built along Lombard Street that is currently a parking lot that will be completed and fully rented. In the second phase, five high-quality affordable apartment units will be built on a highly visible corner of two well-traveled streets. The third phase will focus on the highest best use of ground floor level. Funding will be used for the second phase of this project.
Amount Appropriated
$5.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The long-vacant church building at 10 th & Lombard in the Eastside neighborhood will be redeveloped to include at least five affordable, high quality apartments, and a high quality affordable five unit apartment building on adjacent parking lot. We've already completed renovation of the former parsonage, and two affordable apartments are rented. This project will address two serious problems \u2013 lack of quality affordable rentals to serve rent-burdened residents, and far too many vacant buildings that blight the neighborhood.\n\nThe project will remove the safety hazards and blight of a deteriorating vacant building on 10th St., a busy through street in Downtown Wilmington. The project will also return the property to productive use and results in transformation of the 900 block of Lombard and 10th St between Lombard and Pine Streets. The overall project will result in a minimum of 12 high-quality affordable rentals, completed in three phases. In the first phase, five unit affordable apartment buildings will be built along Lombard Street that is currently a parking lot that will be completed and fully rented. In the second phase, five high-quality affordable apartment units will be built on a highly visible corner of two well-traveled streets. The third phase will focus on the highest best use of ground floor level. Funding will be used for the second phase of this project.
Sponsoring Member
Blunt Rochester
Senator · DE
Recipient Organization
Central Baptist Community Development Corporation
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/ed47ebef-3c27-45aa-8a63-5729ce81f8f1" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Central Baptist Community Development Corporation
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.