Design and Permitting for the Reconstruction of the North Jetty Berth in South Boston
Design and Permitting for the Reconstruction of the North Jetty Berth in South Boston
Amount Appropriated
$1.0M
Federal Funding Lifecycle
FY2022FFID tracks stages 1–2 — before this project reaches public procurement channels.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Grant program / solicitation planned
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The Massachusetts Port Authority, or Massport, is requesting $1 M to assist with the design and permitting of the North Jetty Berth Reconstruction Project. It would be a good use of taxpayer funds because the structure is in dire need of rebuilding. Built in 1940, the North Jetty, a deep-water berth located at the Massport Marine Terminal, has significantly deteriorated over the past 15-20 years, and the western third of the pier has been deemed structurally unusable. The remaining portion has s
Sponsoring Member
Stephen Lynch
Representative · MA
Recipient Organization
Design and Permitting for the Reconstruction of the North Jetty Berth in South Boston
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 97,761 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2022
- Category
- other unclassified
- Use Case
- planning design engineering
- Record ID
- e9305a49-78be-4e84-bfe4-07b643979ffb
Found an error in this record?
Report a data errorEmbed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/e9305a49-78be-4e84-bfe4-07b643979ffb" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Design and Permitting for the Reconstruction of the North Jetty Berth in South Boston
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Procurement pathway
medium confidenceLikely procurement owner
recipient
Funding vehicle
grant
Expected channel
Multiple channels — see below
DOT grants flow to state DOTs, transit authorities, cities, and port/airport authorities. Check the state DOT procurement portal and the recipient's own procurement page. SAM.gov is secondary.
Grant flows to state DOT, MPO, city, transit authority, port, or airport. Check state DOT portal or recipient portal first.
Procurement portals to monitor
SAM.gov is one source. Many CPF/CDS-funded solicitations appear first on state and local portals. Check all channels.
Portal coverage confidence varies by state. FFID does not guarantee all local awards appear on these portals. Last updated: static map.
Procurement signals
No matched procurement signal found yet. FFID will check SAM.gov, Grants.gov, and connected state portals weekly. This project may still be in grant agreement, planning, design, or local procurement preparation.
Signal monitoring active from Phase 3 · Last checked: not yet running