City of Ephraim
This project will build on the success of last year\u2019s project by helping to provide safe east side access to Highway 89 for logging trucks, recreational vehicles, and other traffic traveling on Ephraim Canyon Road. Currently significant traffic \u2013 including logging trucks \u2013 travel an indirect route to the highway and must pass an elementary school, creating a significant safety hazard for students, teachers, and parents. We anticipate a significant increase in logging traffic in the coming years due to additional timber sale harvests, so safety concerns will only increase. In addition, pedestrians and bicyclists using the corridor have no option but to be on the road. Many individuals, including those with low and moderate income, must walk or bicycle on the existing road to shopping, places of worship, and community services and events. This project will help provide a new alignment directly connecting Ephraim Canyon Road to Highway 89 benefitting commerce and citizens alike. The project is estimated to cost $6.5 million to complete, and the City requests $5 million in CPF funding to ensure this project is completed. The City has received two Utah Department of Transportation grants totaling nearly $1.6 million, and the City is prepared to work with partners to meet possible matching requirements.\n\nThis is a good use of taxpayer dollars because it reduces road design related safety hazard for drivers on the road and pedestrians and bicyclists using the corridor. Currently significant traffic \u2013 including logging trucks \u2013 travel an indirect route to the highway and must pass an elementary school, creating a significant safety hazard for students, teachers, and parents.
Amount Appropriated
$5.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
This project will build on the success of last year\u2019s project by helping to provide safe east side access to Highway 89 for logging trucks, recreational vehicles, and other traffic traveling on Ephraim Canyon Road. Currently significant traffic \u2013 including logging trucks \u2013 travel an indirect route to the highway and must pass an elementary school, creating a significant safety hazard for students, teachers, and parents. We anticipate a significant increase in logging traffic in the coming years due to additional timber sale harvests, so safety concerns will only increase. In addition, pedestrians and bicyclists using the corridor have no option but to be on the road. Many individuals, including those with low and moderate income, must walk or bicycle on the existing road to shopping, places of worship, and community services and events. This project will help provide a new alignment directly connecting Ephraim Canyon Road to Highway 89 benefitting commerce and citizens alike. The project is estimated to cost $6.5 million to complete, and the City requests $5 million in CPF funding to ensure this project is completed. The City has received two Utah Department of Transportation grants totaling nearly $1.6 million, and the City is prepared to work with partners to meet possible matching requirements.\n\nThis is a good use of taxpayer dollars because it reduces road design related safety hazard for drivers on the road and pedestrians and bicyclists using the corridor. Currently significant traffic \u2013 including logging trucks \u2013 travel an indirect route to the highway and must pass an elementary school, creating a significant safety hazard for students, teachers, and parents.
Sponsoring Member
Chris Stewart
Representative · UT
See every project Chris Stewart has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
City of Ephraim
This recipient has 2 other projects funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/e14ad70e-7b2f-4ffe-be59-1367662ca145" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
City of Ephraim
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.