Wood Baird
The ADEM NPDES Permit for the Coley Creek Wastewater Treatment plant comes under more and more scrutiny every year. The city is still waiting on a long overdue answer to its last application to renew its NPDES Permit for this project. We have been told by the Alabama Department of Environmental Management that it will be a matter of time before the city is unable to meet treatment criteria of our NPDES Permit due to the limited size and flow of the discharge area and ADEM standards becoming stricter. The plant is presently in need of expensive and much needed repairs and due to limited flow into this facility the treatment plant could be eliminated. In order to eliminate this treatment facility a pumping station would need to install in the location of the treatment facility and a new force main installed that would pump the wastewater that once flowed into the Coley Creek Wastewater Treatment to be treated at the City\u2019s Sugar Creek Advanced WWTP. By eliminating the Coley Creek Wastewater Treatment plant the City of Alexander City is able to accomplish two goals which will have a significant environmental benefit to Lake Martin which has been designated as a \u201cTreasured Alabama Lake\u201d
Amount Appropriated
$5.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The ADEM NPDES Permit for the Coley Creek Wastewater Treatment plant comes under more and more scrutiny every year. The city is still waiting on a long overdue answer to its last application to renew its NPDES Permit for this project. We have been told by the Alabama Department of Environmental Management that it will be a matter of time before the city is unable to meet treatment criteria of our NPDES Permit due to the limited size and flow of the discharge area and ADEM standards becoming stricter. The plant is presently in need of expensive and much needed repairs and due to limited flow into this facility the treatment plant could be eliminated. In order to eliminate this treatment facility a pumping station would need to install in the location of the treatment facility and a new force main installed that would pump the wastewater that once flowed into the Coley Creek Wastewater Treatment to be treated at the City\u2019s Sugar Creek Advanced WWTP. By eliminating the Coley Creek Wastewater Treatment plant the City of Alexander City is able to accomplish two goals which will have a significant environmental benefit to Lake Martin which has been designated as a \u201cTreasured Alabama Lake\u201d
Sponsoring Member
Michael Rogers
Representative · AL
See every project Michael Rogers has sponsored, broken out by fiscal year and status.
Start 7-day trial →You hit 2 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- water infrastructure
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/ca115c44-dc38-4e4e-b401-5545e846cdf3" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Wood Baird
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.