Skip to main content
Back to search

City of Moorhead

This project consists of full reconstruction of the roadway due to age and condition, including "complete street" and lane reduction modifications demonstrated in a concept pilot program introduced in 2019. The project includes reconstruction of roadway due to age and condition; adding safety enhancements and creating opportunities for multimodal transportation. The planned reconstruction would make road diet elements permanent, construct sidewalks more accessible for pedestrians, and construct

Amount Appropriated

$500,000

MNFY2022Senate CDS

Federal Funding Lifecycle

FY2022

FFID tracks stages 1–2 — before this project reaches public procurement channels.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Grant program / solicitation planned

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — pre-procurement window open. This project is funded but not yet publicly solicited. FFID surfaces it 12–18 months before SAM.gov.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

This project consists of full reconstruction of the roadway due to age and condition, including "complete street" and lane reduction modifications demonstrated in a concept pilot program introduced in 2019. The project includes reconstruction of roadway due to age and condition; adding safety enhancements and creating opportunities for multimodal transportation. The planned reconstruction would make road diet elements permanent, construct sidewalks more accessible for pedestrians, and construct

Sponsoring Member

Amy Klobuchar

Senator · MN

Recipient Organization

City of Moorhead

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 97,761 projects.

Start free trial

Data Provenance

Source
GAO Tracking the Funds
Status
enacted
Fiscal Year
FY2022
Category
other unclassified
Use Case
research innovation
Record ID
c3f4f59c-ac3f-4beb-b4c8-e8f9b09f4f33

Found an error in this record?

Report a data error

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/c3f4f59c-ac3f-4beb-b4c8-e8f9b09f4f33" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

AK

Amy Klobuchar

D · MN · Senate

(202) 224-3244

Confirmed from FFID congressional source

CM

City of Moorhead

Grant recipient

Confirmed from FFID source

DO

DOT

Administering agency

Inferred pathway based on agency

Procurement pathway

medium confidence

Likely procurement owner

recipient

Funding vehicle

grant

Expected channel

Multiple channels — see below

DOT grants flow to state DOTs, transit authorities, cities, and port/airport authorities. Check the state DOT procurement portal and the recipient's own procurement page. SAM.gov is secondary.

Grant flows to state DOT, MPO, city, transit authority, port, or airport. Check state DOT portal or recipient portal first.

Procurement portals to monitor

SAM.gov is one source. Many CPF/CDS-funded solicitations appear first on state and local portals. Check all channels.

Portal coverage confidence varies by state. FFID does not guarantee all local awards appear on these portals. Last updated: static map.

Procurement signals

No matched procurement signal found yet. FFID will check SAM.gov, Grants.gov, and connected state portals weekly. This project may still be in grant agreement, planning, design, or local procurement preparation.

Signal monitoring active from Phase 3 · Last checked: not yet running