Skip to main content
Back to search

City of St. George, Utah

This project has multiple parts that include widening 1450 South River Road at the Virgin River, realigning 1450 South 3000 East to 1580 South (3650 South \u2013 Washington City), and extending 1450 South further west towards I-15 including a bridge over the Virgin River. Funds will be used to design and construct PHASE I - Phase I: 1450 South Extension; Roadway from River Road to Virgin River Bridge\n\nThis project is a good use of taxpayer dollars because this project will alleviate traffic congestion by improving east-west vehicle flow from the Southern Parkway to the east side of 1-15 towards Santa Clara and Ivins. This will include repairs to the bridge crossing over the Virgin River including enhancing pedestrian access for those using the Virgin River Trail System. The city of St. George is one of the fastest growing cities in the nation and is the 7th largest city in Utah. In addition, the City is home to millions of visitors frequenting nearby national treasures like Zions National Park and other outdoor recreation attractions and many business conventions. The transportation infrastructure needs to be improved and updated to manage this growth and increased traffic congestion that has now become the new normal. Traffic flow has been impeded by the narrow roadway, and pedestrian crossings near the Virgin River trail system need to be enhance for safety as more people use the trail.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

This project has multiple parts that include widening 1450 South River Road at the Virgin River, realigning 1450 South 3000 East to 1580 South (3650 South \u2013 Washington City), and extending 1450 South further west towards I-15 including a bridge over the Virgin River. Funds will be used to design and construct PHASE I - Phase I: 1450 South Extension; Roadway from River Road to Virgin River Bridge\n\nThis project is a good use of taxpayer dollars because this project will alleviate traffic congestion by improving east-west vehicle flow from the Southern Parkway to the east side of 1-15 towards Santa Clara and Ivins. This will include repairs to the bridge crossing over the Virgin River including enhancing pedestrian access for those using the Virgin River Trail System. The city of St. George is one of the fastest growing cities in the nation and is the 7th largest city in Utah. In addition, the City is home to millions of visitors frequenting nearby national treasures like Zions National Park and other outdoor recreation attractions and many business conventions. The transportation infrastructure needs to be improved and updated to manage this growth and increased traffic congestion that has now become the new normal. Traffic flow has been impeded by the narrow roadway, and pedestrian crossings near the Virgin River trail system need to be enhance for safety as more people use the trail.

Recipient Organization

City of St. George, Utah

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
c08968cb-272c-4266-a130-f1809a6a320b

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/c08968cb-272c-4266-a130-f1809a6a320b" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

CS

Chris Stewart

R · UT · House

(202) 225-9730

Confirmed from FFID congressional source

CU

City of St. George, Utah

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.