Skip to main content
Back to search

Town of Northborough, Massachusetts

This municipal sewer project includes the Phase 2 of the Town\u2019s migration of its water and wastewater facilities to current cybersecurity and technology standards for emergency alarms and communications infrastructure. The Town split the project in half due to cost constraints and is currently wrapping up Phase 1 of the upgrade which provided the backbone of the SCADA upgrade. This Phase 2 of the project will update controls for the six remaining sewer pumping station ensuring the Town is meeting current cybersecurity needs.\nThe overall objective of this upgrade project is to provide the operators with the ability to reliably monitor and collect data from the remote locations maintained by the Town of Northborough. The existing wastewater lift stations have been installed over multiple years with a variety of technologies and little commonality between them. The total Project was noticed on the MassDEP State Revolving Fund (SRF) CY21 Intended Use Plan as CWSRF No. 6897.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

This municipal sewer project includes the Phase 2 of the Town\u2019s migration of its water and wastewater facilities to current cybersecurity and technology standards for emergency alarms and communications infrastructure. The Town split the project in half due to cost constraints and is currently wrapping up Phase 1 of the upgrade which provided the backbone of the SCADA upgrade. This Phase 2 of the project will update controls for the six remaining sewer pumping station ensuring the Town is meeting current cybersecurity needs.\nThe overall objective of this upgrade project is to provide the operators with the ability to reliably monitor and collect data from the remote locations maintained by the Town of Northborough. The existing wastewater lift stations have been installed over multiple years with a variety of technologies and little commonality between them. The total Project was noticed on the MassDEP State Revolving Fund (SRF) CY21 Intended Use Plan as CWSRF No. 6897.

Recipient Organization

Town of Northborough, Massachusetts

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
water infrastructure
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
bcb764c6-341f-4096-ba3c-9b835b2ffdb6

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/bcb764c6-341f-4096-ba3c-9b835b2ffdb6" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

JM

James McGovern

D · MA · District MA-02

(202) 225-6101

Confirmed from FFID congressional source

TM

Town of Northborough, Massachusetts

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.