City of Portage, Indiana
The primary purposes of this project are to address the deteriorating infrastructure along Central Avenue, reducing congestion, improving driver and pedestrian safety, and improving storm water management throughout the corridor. Central Avenue in Portage currently exists as one through lane in each direction. The roadway has minimal shoulders, no curb and gutter, one signalized intersection, limited sidewalks, and minimal roadway lighting. Funding secured for the balance of Preliminary Engineering, Right-of-Way Acquisition Services and Land Costs that are not currently allocated for through NIRPC will address inadequate safety conditions for both pedestrians and motorists along the project corridor, address deteriorating infrastructure along Central Avenue, reduce congestion along the corridor, and address stormwater drainage issues.
Amount Appropriated
$2.4M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The primary purposes of this project are to address the deteriorating infrastructure along Central Avenue, reducing congestion, improving driver and pedestrian safety, and improving storm water management throughout the corridor. Central Avenue in Portage currently exists as one through lane in each direction. The roadway has minimal shoulders, no curb and gutter, one signalized intersection, limited sidewalks, and minimal roadway lighting. Funding secured for the balance of Preliminary Engineering, Right-of-Way Acquisition Services and Land Costs that are not currently allocated for through NIRPC will address inadequate safety conditions for both pedestrians and motorists along the project corridor, address deteriorating infrastructure along Central Avenue, reduce congestion along the corridor, and address stormwater drainage issues.
Sponsoring Member
Frank Mrvan
Representative · IN
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/a93fc429-e326-4909-9671-0938736dff51" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
City of Portage, Indiana
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.