City of Cumberland
In June of 2018, the Fayette Street Bridge was struck by a CSX Transportation train that was inadvertently pulling double stacked cars through a corridor that had insufficient vertical clearance. CSX repaired the bridge sufficiently to reopen the bridge but only to one-way traffic. The existing bridge has 18'-2" of vertical clearance and with a 45'-6" span, Fayette Street is classified as a Major Urban Collector and it is vital to a neighborhood that is hindered by two other closed bridges, one of which is in the design stage for replacement under the Federal Bridge program. Replacing the Fayette Street Bridge, when combined with the already planned Cumberland Street Bridge Construction in 2023, will be a great step forward to restoring traffic flows and preserving a portion of the City\u2019s infrastructure for decades. A properly functioning and maintained road network can be an attraction to a workforce that is needed to support the County\u2019s business community.
Amount Appropriated
$4.8M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
In June of 2018, the Fayette Street Bridge was struck by a CSX Transportation train that was inadvertently pulling double stacked cars through a corridor that had insufficient vertical clearance. CSX repaired the bridge sufficiently to reopen the bridge but only to one-way traffic. The existing bridge has 18'-2" of vertical clearance and with a 45'-6" span, Fayette Street is classified as a Major Urban Collector and it is vital to a neighborhood that is hindered by two other closed bridges, one of which is in the design stage for replacement under the Federal Bridge program. Replacing the Fayette Street Bridge, when combined with the already planned Cumberland Street Bridge Construction in 2023, will be a great step forward to restoring traffic flows and preserving a portion of the City\u2019s infrastructure for decades. A properly functioning and maintained road network can be an attraction to a workforce that is needed to support the County\u2019s business community.
Sponsoring Member
David Trone
Representative · MD
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/a6d94e01-f30c-4fb4-adc6-bfec1c7cf389" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
City of Cumberland
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.