Skip to main content
Back to search

City of Medford

The City of Medford ran an extensive community outreach effort to inform a plan for the full renovation of Carr Park. Community members made clear a strong desire to integrate any recreation improvements with forward-looking climate mitigation and environmental conservation strategies. This funding request is for a solar PV array over the basketball court which will power the EV charging stations, new LED lighting and phone and laptop charging stations in the pavilion and the water features in the playground. Any additional electricity generated will power the fire station across the street. The basketball court and shaded pavilion would be an excellent public demonstration of the application of solar energy and provide an opportunity to promote learning via interpretive signage on renewable energy. Additional elements of this portion of the park include a second basketball court, skateboarding and swing facilities, a four-season playground with integrated water features for cooling, and a natural play area with a slide built into the side of a small hill that could be used for winter sledding. Medford\u2019s Open Space and Recreation Plan (OSRP) identifies Carr Park as experiencing urban heat island effect. This resilient community solar park will offer inventive strategies for both mitigating heat impacts and capturing solar energy. Water features in the playground will provide much needed relief during the summers, which are getting increasingly hotter in New England. The pavilion offers shade and seating and is an excellent opportunity to incorporate renewable energy into the park. Carr Park is in notably poor condition and undergoes a high intensity of use. This project meets community-identified, high priority needs for both the surrounding neighborhood and regional community.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The City of Medford ran an extensive community outreach effort to inform a plan for the full renovation of Carr Park. Community members made clear a strong desire to integrate any recreation improvements with forward-looking climate mitigation and environmental conservation strategies. This funding request is for a solar PV array over the basketball court which will power the EV charging stations, new LED lighting and phone and laptop charging stations in the pavilion and the water features in the playground. Any additional electricity generated will power the fire station across the street. The basketball court and shaded pavilion would be an excellent public demonstration of the application of solar energy and provide an opportunity to promote learning via interpretive signage on renewable energy. Additional elements of this portion of the park include a second basketball court, skateboarding and swing facilities, a four-season playground with integrated water features for cooling, and a natural play area with a slide built into the side of a small hill that could be used for winter sledding. Medford\u2019s Open Space and Recreation Plan (OSRP) identifies Carr Park as experiencing urban heat island effect. This resilient community solar park will offer inventive strategies for both mitigating heat impacts and capturing solar energy. Water features in the playground will provide much needed relief during the summers, which are getting increasingly hotter in New England. The pavilion offers shade and seating and is an excellent opportunity to incorporate renewable energy into the park. Carr Park is in notably poor condition and undergoes a high intensity of use. This project meets community-identified, high priority needs for both the surrounding neighborhood and regional community.

Recipient Organization

City of Medford

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
parks recreation trails

Found an error in this record?

Report a data error
Technical & source detail
Record ID
9c5edba7-10c3-4818-aeb7-3703d33853e4

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/9c5edba7-10c3-4818-aeb7-3703d33853e4" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

KC

Katherine Clark

D · MA · District MA-05

(202) 225-2836

Confirmed from FFID congressional source

CM

City of Medford

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.