Summit County Government
This project is a good use of tax payer funds because it provides a necessary service to Summit County residents, and will attract and retain workforce in one of the most desirable tourism areas in the state. In Summit, childcare options include childcare centers, public elementary early childhood education (ECE) programs, and licensed family childcare providers. Collectively these options can serve 661 children per day. There are currently 559 unduplicated children on waitlists for childcare, which is up from 345 in 2018. 42% of children on the waitlist for care are either unborn or younger than 12 months old. This indicates that demand for childcare is rising and is significantly higher than what existing providers can accommodate. \n\nSummit County and Town of Silverthorne have completed designs on a childcare center to be housed at Smith Ranch, a deed restricted housing development. The proposed childcare center will be able to serve 65 to 70 children including Early/Head Start students ranging from infant to preschool age. At the onset of the project, the estimated cost of the center was $4 million. Due to escalating construction costs over the last year, the construction estimate for the center is approximately $9.7 million. However, the need for childcare is so dire that we believe it is imperative to move forward with the project.\n\nCPF comes at exactly the right time for us to move forward with this much-needed facility, maintain our schedule, and provide an appropriate and necessary space for this critical community service.
Amount Appropriated
$4.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
This project is a good use of tax payer funds because it provides a necessary service to Summit County residents, and will attract and retain workforce in one of the most desirable tourism areas in the state. In Summit, childcare options include childcare centers, public elementary early childhood education (ECE) programs, and licensed family childcare providers. Collectively these options can serve 661 children per day. There are currently 559 unduplicated children on waitlists for childcare, which is up from 345 in 2018. 42% of children on the waitlist for care are either unborn or younger than 12 months old. This indicates that demand for childcare is rising and is significantly higher than what existing providers can accommodate. \n\nSummit County and Town of Silverthorne have completed designs on a childcare center to be housed at Smith Ranch, a deed restricted housing development. The proposed childcare center will be able to serve 65 to 70 children including Early/Head Start students ranging from infant to preschool age. At the onset of the project, the estimated cost of the center was $4 million. Due to escalating construction costs over the last year, the construction estimate for the center is approximately $9.7 million. However, the need for childcare is so dire that we believe it is imperative to move forward with the project.\n\nCPF comes at exactly the right time for us to move forward with this much-needed facility, maintain our schedule, and provide an appropriate and necessary space for this critical community service.
Sponsoring Member
Joseph Neguse
Representative · CO
See every project Joseph Neguse has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
Summit County Government
This recipient has 5 other projects funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/983c4d5c-df58-4099-970c-260e3842f83c" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Summit County Government
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.