Skip to main content
Back to search

Tim Davis

I request $5 million for the City of Temple\u2019s Sanitary Sewer Overflow Reduction Project. Portions of the City of Temple\u2019s Knob Creek and Little Elm Creek sewer collection basins are particularly challenged by one of Temple\u2019s best natural features: mature tree cover. This has led to advanced root intrusion into older, more vulnerable sanitary sewer pipes which fills the pipe space with the trees\u2019 underground bio infrastructure, reducing the capacity of the pipes to carry sewage, and increasing both the frequency and severity of sewer overflows. Overflows of sewage are visually offensive, malodorous, and potentially damaging to groundcover and bodies of water. Proactive, designed rehabilitation projects can remedy these root causes in an orderly and scheduled fashion that will be more protective of the valued landscaping amenities and other delicate elements of the neighborhoods\u2019 quality of life. This request would implement a variety of sewer improvements totaling $3M for Knob Creek and $2M for Little Elm Creek that are critical for restoring safe, sanitary, and reliable services to support excellent quality of life in these valued core neighborhoods and is thus a wise use of federal tax dollars.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

I request $5 million for the City of Temple\u2019s Sanitary Sewer Overflow Reduction Project. Portions of the City of Temple\u2019s Knob Creek and Little Elm Creek sewer collection basins are particularly challenged by one of Temple\u2019s best natural features: mature tree cover. This has led to advanced root intrusion into older, more vulnerable sanitary sewer pipes which fills the pipe space with the trees\u2019 underground bio infrastructure, reducing the capacity of the pipes to carry sewage, and increasing both the frequency and severity of sewer overflows. Overflows of sewage are visually offensive, malodorous, and potentially damaging to groundcover and bodies of water. Proactive, designed rehabilitation projects can remedy these root causes in an orderly and scheduled fashion that will be more protective of the valued landscaping amenities and other delicate elements of the neighborhoods\u2019 quality of life. This request would implement a variety of sewer improvements totaling $3M for Knob Creek and $2M for Little Elm Creek that are critical for restoring safe, sanitary, and reliable services to support excellent quality of life in these valued core neighborhoods and is thus a wise use of federal tax dollars.

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
water infrastructure
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
88aef952-a3e7-44fd-b520-89ef2c4fcbab

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/88aef952-a3e7-44fd-b520-89ef2c4fcbab" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

JC

John Carter

R · TX · District TX-31

(202) 225-3864

Confirmed from FFID congressional source

TD

Tim Davis

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.