Skip to main content
Back to search

Petersburg Pharmaceutical Park/ Poor Creek Sewer Service Area Infrastructure Upgrades

Petersburg Pharmaceutical Park/ Poor Creek Sewer Service Area Infrastructure Upgrades

Amount Appropriated

$14.2M

VAFY2022House CPF

Federal Funding Lifecycle

FY2022

FFID tracks stages 1–2 — before this project reaches public procurement channels.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Grant program / solicitation planned

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — pre-procurement window open. This project is funded but not yet publicly solicited. FFID surfaces it 12–18 months before SAM.gov.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

To address the Poor Creek Sewer Service Area infrastructure upgrade requirements. The Poor Creek pump station and force main were constructed in the mid-1970’s. A 2006 drainage study identified that most of the infrastructure was at hydraulic capacity. Lack of capacity can result in decreased water pressure, which impacts customer water service, and immediately threatens the Southside Regional Medical Center, which is a public health crisis. Low pressure also creates problems with firefighting.

Sponsoring Member

Aston McEachin

Representative · VA

Recipient Organization

Petersburg Pharmaceutical Park/ Poor Creek Sewer Service Area Infrastructure Upgrades

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 97,761 projects.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2022
Category
other unclassified
Use Case
water infrastructure
Record ID
8384e87f-e49d-4c63-9d5d-79d9c53d3274

Found an error in this record?

Report a data error

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/8384e87f-e49d-4c63-9d5d-79d9c53d3274" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

AM

Aston McEachin

D · VA · House

(202) 225-6365

Confirmed from FFID congressional source

PU

Petersburg Pharmaceutical Park/ Poor Creek Sewer Service Area Infrastructure Upgrades

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

EP

EPA

Administering agency

Inferred pathway based on agency

Procurement pathway

high confidence

Likely procurement owner

recipient

Funding vehicle

grant

Expected channel

Recipient procurement portal

EPA water and environmental grants flow to cities, utilities, and water districts. The recipient runs the procurement — typically on their own portal or a state water board system, not SAM.gov.

Grant flows to city, utility, or water district. RFP typically on recipient procurement portal or state water board portal — not SAM.gov.

Procurement portals to monitor

SAM.gov is one source. Many CPF/CDS-funded solicitations appear first on state and local portals. Check all channels.

Portal coverage confidence varies by state. FFID does not guarantee all local awards appear on these portals. Last updated: static map.

Procurement signals

No matched procurement signal found yet. FFID will check SAM.gov, Grants.gov, and connected state portals weekly. This project may still be in grant agreement, planning, design, or local procurement preparation.

Signal monitoring active from Phase 3 · Last checked: not yet running