Skip to main content
Back to search

City Of Roswell

The proposed Ace Sand Park Stormwater Children\u2019s Garden and Adventure Path is a green infrastructure project that support stormwater system resiliency and will provide water storage and filtration benefits, and green streets, where vegetation, soil, and engineered systems are combined to direct and filter rainwater from impervious surfaces. \n\nThe Children\u2019s Stormwater Garden and Adventure Path project is designed to engage the imagination and actively learn and understand the complex river and stormwater dynamics at work in the project area. Kids and adults of all ages will be able to pump water from interactive pumping stations and actively manage the water on its \u201ctrip\u201d to the retention basin which is an interactive sand pit. The sand pit is located just above the stormwater treatment area which will act as the final treatment of the water from both the interactive play area and the stormwater drainage and treatment system.\n\nEnvironmental restoration work would include: 1) eradicating invasive species; 2) constructing a new stream to meander and improve stormwater conveyance; 3) constructing wetlands along the stream meander to increase stormwater mitigation; 4) reforesting the cleared areas; 5) remediating stream bank erosion and degradation along the Chattahoochee; and 6) replanting the site with native riparian vegetation to stabilize the stream bank, restore the 25-foot state stream buffer and provide wildlife habitat throughout the site. The second stage of this project would be to design the area as an interactive playground of sensory elements within the children\u2019s garden that invites and encourages kids to explore and engage with the natural environment while providing educational information about the importance of protecting our natural water resources.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The proposed Ace Sand Park Stormwater Children\u2019s Garden and Adventure Path is a green infrastructure project that support stormwater system resiliency and will provide water storage and filtration benefits, and green streets, where vegetation, soil, and engineered systems are combined to direct and filter rainwater from impervious surfaces. \n\nThe Children\u2019s Stormwater Garden and Adventure Path project is designed to engage the imagination and actively learn and understand the complex river and stormwater dynamics at work in the project area. Kids and adults of all ages will be able to pump water from interactive pumping stations and actively manage the water on its \u201ctrip\u201d to the retention basin which is an interactive sand pit. The sand pit is located just above the stormwater treatment area which will act as the final treatment of the water from both the interactive play area and the stormwater drainage and treatment system.\n\nEnvironmental restoration work would include: 1) eradicating invasive species; 2) constructing a new stream to meander and improve stormwater conveyance; 3) constructing wetlands along the stream meander to increase stormwater mitigation; 4) reforesting the cleared areas; 5) remediating stream bank erosion and degradation along the Chattahoochee; and 6) replanting the site with native riparian vegetation to stabilize the stream bank, restore the 25-foot state stream buffer and provide wildlife habitat throughout the site. The second stage of this project would be to design the area as an interactive playground of sensory elements within the children\u2019s garden that invites and encourages kids to explore and engage with the natural environment while providing educational information about the importance of protecting our natural water resources.

Recipient Organization

City Of Roswell

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
water infrastructure

Found an error in this record?

Report a data error
Technical & source detail
Record ID
7d8d782a-7595-4608-8e62-56760bd8c664

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/7d8d782a-7595-4608-8e62-56760bd8c664" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

LM

Lucy McBath

D · GA · District GA-06

(202) 225-4501

Confirmed from FFID congressional source

CR

City Of Roswell

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.