Skip to main content
Back to search

Northwest Arkansas National Airport

This request would fund $7 million of the expected $12.5 million project cost to replace the existing air traffic control tower (ATCT) at Northwest Arkansas National Airport (XNA). Funding concerns and tight timelines in 1998 forced the Airport Authority to build and equip the current ATCT as a temporary facility. The existing ATCT has no fire control system, no fire rated walls, lacks ADA accessibility, and lacks adequate space for vital equipment. Currently, much of the FAA required equipment is kept in a CONEX at the base of the ATCT and the manager\u2019s office as well as the staff breakroom are in modular units near the base of the tower. More importantly, the current ATCT has a cab height of 47\u2019 which is inadequate to need due to the 2012 addition of Runway 17/35 which was built to provide an alternate landing area while the main runway (RW 16/34) was undergoing renovation and will ultimately serve as a parallel runway. Furthermore, a third runway is expected to be built east of the terminal building (other side of the building from the current runways). To be FAA-compliant and meet expected future needs the new ATCT will have a cab height of 124\u2019. For 2019, XNA ranked as the 99th busiest airport in the U.S. with 1,846,374 passengers arriving and departing from the airport. No federal or FAA funds were used to construct the current (and original) ATCT. The airport has not applied for funds for this project and they can obligate funds within 12 months of receiving the funds. The airport has committed to funding the remainder of the project with airport funds.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

This request would fund $7 million of the expected $12.5 million project cost to replace the existing air traffic control tower (ATCT) at Northwest Arkansas National Airport (XNA). Funding concerns and tight timelines in 1998 forced the Airport Authority to build and equip the current ATCT as a temporary facility. The existing ATCT has no fire control system, no fire rated walls, lacks ADA accessibility, and lacks adequate space for vital equipment. Currently, much of the FAA required equipment is kept in a CONEX at the base of the ATCT and the manager\u2019s office as well as the staff breakroom are in modular units near the base of the tower. More importantly, the current ATCT has a cab height of 47\u2019 which is inadequate to need due to the 2012 addition of Runway 17/35 which was built to provide an alternate landing area while the main runway (RW 16/34) was undergoing renovation and will ultimately serve as a parallel runway. Furthermore, a third runway is expected to be built east of the terminal building (other side of the building from the current runways). To be FAA-compliant and meet expected future needs the new ATCT will have a cab height of 124\u2019. For 2019, XNA ranked as the 99th busiest airport in the U.S. with 1,846,374 passengers arriving and departing from the airport. No federal or FAA funds were used to construct the current (and original) ATCT. The airport has not applied for funds for this project and they can obligate funds within 12 months of receiving the funds. The airport has committed to funding the remainder of the project with airport funds.

Recipient Organization

Northwest Arkansas National Airport

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
698606d8-b16b-4ae6-a940-113b04cfe4c6

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/698606d8-b16b-4ae6-a940-113b04cfe4c6" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

SW

Steve Womack

R · AR · District AR-03

(202) 225-4301

Confirmed from FFID congressional source

NA

Northwest Arkansas National Airport

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.