Reconstruction of Iowa Highway 38
INTRODUCTION / PURPOSEOur proposed project is the first two of three phases of the reconstruction of Iowa Highway 38 which is also known as Cedar Street. This is Tipton's "Main Street." The project is planned to take place over three phases with a total estimated cost of $6,860,142. Since this is a shared jurisdiction with IDOT, this breaks out into the estimated cost of City $4,372,061 and IDOT $2,488,081. Separate from this shared project, IDOT plans to spend another $898,900 on Hwy 38 on the
Amount Appropriated
$1.0M
Federal Funding Lifecycle
FY2022FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Co-Requestors
Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
INTRODUCTION / PURPOSEOur proposed project is the first two of three phases of the reconstruction of Iowa Highway 38 which is also known as Cedar Street. This is Tipton's "Main Street." The project is planned to take place over three phases with a total estimated cost of $6,860,142. Since this is a shared jurisdiction with IDOT, this breaks out into the estimated cost of City $4,372,061 and IDOT $2,488,081. Separate from this shared project, IDOT plans to spend another $898,900 on Hwy 38 on the
Sponsoring Member
Mariannette Miller-Meeks
Representative · IA
Recipient Organization
Reconstruction of Iowa Highway 38
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2022
- Category
- other unclassified
- Use Case
- facility renovation
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/6653516f-6e84-4ad4-a195-9b12ae4194cf" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Mariannette Miller-Meeks
R · IA · District IA-01
Confirmed from FFID congressional source
Reconstruction of Iowa Highway 38
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
medium confidenceLikely procurement owner
recipient
Funding vehicle
grant
Expected channel
Multiple channels — see below
DOT grants flow to state DOTs, transit authorities, cities, and port/airport authorities. Check the state DOT procurement portal and the recipient's own procurement page. SAM.gov is secondary.
Grant flows to state DOT, MPO, city, transit authority, port, or airport. Check state DOT portal or recipient portal first.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.