The Vallecillo Road Project is approximately 2.75 miles of new location east-west roadway about a mile-and-a-half north of Interstate 69W (IH-69W) and aligned with A.F. Muller Blvd. This will be a five-lane roadway directly connecting FM 1472 with IH-35. The project includes a continuous 150\u2019 wide right-of-way for future expansion and will be located in an area where continued industrial growth and development is expected. Sidewalks are planned for both sides including a 10\u2019 shared-use path on one side, making the project an important part of safe multimodal travel through this part of Laredo. 37% of all trade between the U.S. and Mexico comes through the Laredo Port-of-Entry totaling over $200 billion in annual trade resulting in 2.3 million trucks traveling north into Laredo each year of which 90% go through World Trade Bridge. FM 1472 is the only main arterial that receives the majority of this traffic that undergoes 60,000 vehicles per day of which 60% is tractor trailer traffic. There is only one major roadway that connects IH 35 to FM 1472; thus, FM 1472 is highly congested which presents challenges for the movement of trade. In addition to the challenges with the movement of trade traffic, the high traffic volume and the very limited connection points on FM 1472 make it extremely difficult for fire and emergency vehicles to traverse FM 1472 during instances of major vehicular accidents or other emergencies. Vallecillo Road will provide another major ingress and egress connection between FM 1472 and IH 35 and better allow for the movement of goods from industrial area receiving trade from Mexico to IH 35 which will improve Mobility through alternate routes to congestion, improve Safety for the traveling public and increase Economic Development & Regional Tax Base.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The Vallecillo Road Project is approximately 2.75 miles of new location east-west roadway about a mile-and-a-half north of Interstate 69W (IH-69W) and aligned with A.F. Muller Blvd. This will be a five-lane roadway directly connecting FM 1472 with IH-35. The project includes a continuous 150\u2019 wide right-of-way for future expansion and will be located in an area where continued industrial growth and development is expected. Sidewalks are planned for both sides including a 10\u2019 shared-use path on one side, making the project an important part of safe multimodal travel through this part of Laredo. 37% of all trade between the U.S. and Mexico comes through the Laredo Port-of-Entry totaling over $200 billion in annual trade resulting in 2.3 million trucks traveling north into Laredo each year of which 90% go through World Trade Bridge. FM 1472 is the only main arterial that receives the majority of this traffic that undergoes 60,000 vehicles per day of which 60% is tractor trailer traffic. There is only one major roadway that connects IH 35 to FM 1472; thus, FM 1472 is highly congested which presents challenges for the movement of trade. In addition to the challenges with the movement of trade traffic, the high traffic volume and the very limited connection points on FM 1472 make it extremely difficult for fire and emergency vehicles to traverse FM 1472 during instances of major vehicular accidents or other emergencies. Vallecillo Road will provide another major ingress and egress connection between FM 1472 and IH 35 and better allow for the movement of goods from industrial area receiving trade from Mexico to IH 35 which will improve Mobility through alternate routes to congestion, improve Safety for the traveling public and increase Economic Development & Regional Tax Base.

Recipient Organization

Webb County-City of Laredo Regional Mobility Authority

You hit 2 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
659bd938-5e94-45c9-a8c7-f8e3328a76ba

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/659bd938-5e94-45c9-a8c7-f8e3328a76ba" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

HC

Henry Cuellar

D · TX · District TX-28

(202) 225-1640

Confirmed from FFID congressional source

WA

Webb County-City of Laredo Regional Mobility Authority

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.