Salt Lake City Corporation
The federal assistance will be used for transit signal (TSP) and high visibility signage and pavement markings. These are modular elements slated for addition to the transit corridor following the locally funded reconstruction of 200 South in 2022-2023. The TSP equipment upgrades signal and technology systems to improve transit reliability and automobile capacity. High visibility signage and pavement markings, such as red transit lanes, designate side-running transit priority lanes (e.g., BRT-like) with boarding island stations to reduce bus dwell times, minimize conflicts with traffic and cyclists, and accommodate increased bus activity.\n\nThe 200 South Transit Corridor Phase 3: Transit Lane Compliance and Capacity Optimization is the next phase in the transformation of 200 South for Bus Rapid Transit to deliver fast and efficient service for multiple regional bus routes connecting major economic and education centers in the \\\xfc/Wasatch Font region. The project upgrades traffic components that allow the 200 South Transit Corridor to accommodate twelve bus routes with roughly 1,100 bus trips per day for existing local routes and new regional routes serving South Davis County and westside communities in Salt Lake City.\n\nThis project is a good use of taxpayer dollars because it will increase air quality, enhance quality of life, and unlock the vision for the developing Bus Rapid Transit corridor that increases mobility and connectivity for the region.
Amount Appropriated
$2.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The federal assistance will be used for transit signal (TSP) and high visibility signage and pavement markings. These are modular elements slated for addition to the transit corridor following the locally funded reconstruction of 200 South in 2022-2023. The TSP equipment upgrades signal and technology systems to improve transit reliability and automobile capacity. High visibility signage and pavement markings, such as red transit lanes, designate side-running transit priority lanes (e.g., BRT-like) with boarding island stations to reduce bus dwell times, minimize conflicts with traffic and cyclists, and accommodate increased bus activity.\n\nThe 200 South Transit Corridor Phase 3: Transit Lane Compliance and Capacity Optimization is the next phase in the transformation of 200 South for Bus Rapid Transit to deliver fast and efficient service for multiple regional bus routes connecting major economic and education centers in the \\\xfc/Wasatch Font region. The project upgrades traffic components that allow the 200 South Transit Corridor to accommodate twelve bus routes with roughly 1,100 bus trips per day for existing local routes and new regional routes serving South Davis County and westside communities in Salt Lake City.\n\nThis project is a good use of taxpayer dollars because it will increase air quality, enhance quality of life, and unlock the vision for the developing Bus Rapid Transit corridor that increases mobility and connectivity for the region.
Sponsoring Member
Chris Stewart
Representative · UT
See every project Chris Stewart has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
Salt Lake City Corporation
This recipient has 4 other projects funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/51b09eab-13a4-4b88-9c06-cb0af4a99ce2" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.