Skip to main content
Back to search

Borough of Carteret

The overall vision for the site of the ferry terminal includes two miles of open public access waterfront along the Arthur Kill; construction of a $47 million marina next door to the project site, which is completed; dredging for commercial port activities; the construction of two commercial docks along with infrastructure to support it; the construction of a 500,000 square-foot film production studio; and 150,000 square feet of ancillary retail and hotel space. The Borough, together with its partners including the NJ Department of Transportation, NJ TRANSIT, NJ Transportation Planning Authority, and Port Authority of New York and New Jersey, envision improved, faster, and more environmentally friendly transportation options between central New Jersey and New York City via the introduction of daily ferry service and access via NJ TRANSIT bus and Borough jitney services. The project site will include a mixed-use, multimodal ferry building consisting of a passenger terminal/waiting area, educational center, Carteret Port Authority office space, overnight passenger and crew rooms, and a rooftop deck. The project site will also connect to a 20-foot-wide elevated pedestrian boardwalk, fixed pier, floating docks, wave screen, and handicap access ramp. The project encompasses environmental remediation, public access and recreation, economic development, and improved public transportation.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The overall vision for the site of the ferry terminal includes two miles of open public access waterfront along the Arthur Kill; construction of a $47 million marina next door to the project site, which is completed; dredging for commercial port activities; the construction of two commercial docks along with infrastructure to support it; the construction of a 500,000 square-foot film production studio; and 150,000 square feet of ancillary retail and hotel space. The Borough, together with its partners including the NJ Department of Transportation, NJ TRANSIT, NJ Transportation Planning Authority, and Port Authority of New York and New Jersey, envision improved, faster, and more environmentally friendly transportation options between central New Jersey and New York City via the introduction of daily ferry service and access via NJ TRANSIT bus and Borough jitney services. The project site will include a mixed-use, multimodal ferry building consisting of a passenger terminal/waiting area, educational center, Carteret Port Authority office space, overnight passenger and crew rooms, and a rooftop deck. The project site will also connect to a 20-foot-wide elevated pedestrian boardwalk, fixed pier, floating docks, wave screen, and handicap access ramp. The project encompasses environmental remediation, public access and recreation, economic development, and improved public transportation.

Recipient Organization

Borough of Carteret

Locked

This recipient has 31 other projects funded in FFID. See the full history.

Start 7-day trial →

You hit 3 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
4a4218c0-09ba-4d90-b013-4d0246ee2080

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/4a4218c0-09ba-4d90-b013-4d0246ee2080" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

FP

Frank Pallone

D · NJ · District NJ-06

(202) 225-4671

Confirmed from FFID congressional source

BC

Borough of Carteret

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.