Bois Forte Band of Chippewa
Bois Forte Reservation maintains a concrete water control dam to regulate water to support production of wild rice, a cultural and economic natural resource of critical importance for the Band. The dam spans an 80-foot river reach and water level is regulated with two, manually operated flow control gates. This structure was constructed in 1987, is now in severe disrepair, and is anticipated to experience complete failure in the near future. No imminent flooding or other damage is anticipated to
Amount Appropriated
$745,000
Federal Funding Lifecycle
FY2022FFID tracks stages 1–2 — before this project reaches public procurement channels.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Grant program / solicitation planned
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
Bois Forte Reservation maintains a concrete water control dam to regulate water to support production of wild rice, a cultural and economic natural resource of critical importance for the Band. The dam spans an 80-foot river reach and water level is regulated with two, manually operated flow control gates. This structure was constructed in 1987, is now in severe disrepair, and is anticipated to experience complete failure in the near future. No imminent flooding or other damage is anticipated to
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 97,761 projects.
Data Provenance
- Source
- GAO Tracking the Funds
- Status
- enacted
- Fiscal Year
- FY2022
- Category
- other unclassified
- Use Case
- water infrastructure
- Record ID
- 46bfafb9-b1ac-474b-9732-054f91306581
Found an error in this record?
Report a data errorEmbed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/46bfafb9-b1ac-474b-9732-054f91306581" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Bois Forte Band of Chippewa
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Procurement pathway
high confidenceLikely procurement owner
recipient
Funding vehicle
grant
Expected channel
Recipient procurement portal
EPA water and environmental grants flow to cities, utilities, and water districts. The recipient runs the procurement — typically on their own portal or a state water board system, not SAM.gov.
Grant flows to city, utility, or water district. RFP typically on recipient procurement portal or state water board portal — not SAM.gov.
Procurement portals to monitor
SAM.gov is one source. Many CPF/CDS-funded solicitations appear first on state and local portals. Check all channels.
Portal coverage confidence varies by state. FFID does not guarantee all local awards appear on these portals. Last updated: static map.
Procurement signals
No matched procurement signal found yet. FFID will check SAM.gov, Grants.gov, and connected state portals weekly. This project may still be in grant agreement, planning, design, or local procurement preparation.
Signal monitoring active from Phase 3 · Last checked: not yet running