Tooele City Corporation
Tooele City and other municipalities within the Tooele valley have provided water to residents since the mid-1850s. Currently, no entity in Tooele County is connected to a regional water district (such as the Jordan Valley Water Conservancy District or the Central Utah Water Project). Servicing water through locally drilled municipal wells has become increasingly difficult. \r\n\r\nTooele City is working with Tooele County, Grantsville, and the Stansbury Park Improvement District to connect municipal water systems and form a joint Water Service District. This would reduce risk of service failure in times of emergency incidents or drought. \r\n\r\nThis proposed project by Tooele City proposes to bring water 28 miles from a site in Rush Valley, UT where the City owns significant water rights. The proposed project would construct a water line (estimated $1M per mile), a water storage tank, rehabilitation of existing wells in Rush Valley, and construction of well-houses and booster stations. UDOT has positively indicated the possible use of State highway right of way, and Tooele City has reserved property for the location of a booster station. Total project costs are estimated to be $54 Million. Tooele City is prepared initiate mechanisms to cover a cost share as needed. Partial funding would allow key elements of the project to be completed (well rehab, storage tanks, or well houses).\r\n
Amount Appropriated
$4.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
Tooele City and other municipalities within the Tooele valley have provided water to residents since the mid-1850s. Currently, no entity in Tooele County is connected to a regional water district (such as the Jordan Valley Water Conservancy District or the Central Utah Water Project). Servicing water through locally drilled municipal wells has become increasingly difficult. \r\n\r\nTooele City is working with Tooele County, Grantsville, and the Stansbury Park Improvement District to connect municipal water systems and form a joint Water Service District. This would reduce risk of service failure in times of emergency incidents or drought. \r\n\r\nThis proposed project by Tooele City proposes to bring water 28 miles from a site in Rush Valley, UT where the City owns significant water rights. The proposed project would construct a water line (estimated $1M per mile), a water storage tank, rehabilitation of existing wells in Rush Valley, and construction of well-houses and booster stations. UDOT has positively indicated the possible use of State highway right of way, and Tooele City has reserved property for the location of a booster station. Total project costs are estimated to be $54 Million. Tooele City is prepared initiate mechanisms to cover a cost share as needed. Partial funding would allow key elements of the project to be completed (well rehab, storage tanks, or well houses).\r\n
Sponsoring Member
Chris Stewart
Representative · UT
See every project Chris Stewart has sponsored, broken out by fiscal year and status.
Start 7-day trial →You hit 2 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- water infrastructure
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/44a4e120-3e04-43b6-abd3-fef1dd6d13c7" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Tooele City Corporation
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.