Loudoun County, Virginia
This project provides for design, land acquisition, utility relocation, and construction of a compressed, urban diamond interchange at Route 7 at Hillsboro Road west of Purcellville, and roundabouts at the ramp termini. The scope of work pedestrian accommodations, as well as the construction of a shared-use path along Hillsboro Road which will improve connectivity for 21st Street in Purcellville to Fields Farm Park Road. The project is proposed to increase the connectivity in the roadway network around Purcellville, and provide a more direct route on major roadways to areas north and north east of the Route 7 bypass, including the schools complex at Woodgrove High School and Mountain View Elementary on Allder School Road (Route 711). The existing roadway network does not provide an ease of access for the local community to points north and northeast, particularly with the recent completion of Woodgrove High School northeast of the overpass. To access the Schools complex, drivers from the west, southwest, and east are forced to use a network of narrow and unsurfaced roads, or travel through downtown Purcellville.
Amount Appropriated
$4.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
This project provides for design, land acquisition, utility relocation, and construction of a compressed, urban diamond interchange at Route 7 at Hillsboro Road west of Purcellville, and roundabouts at the ramp termini. The scope of work pedestrian accommodations, as well as the construction of a shared-use path along Hillsboro Road which will improve connectivity for 21st Street in Purcellville to Fields Farm Park Road. The project is proposed to increase the connectivity in the roadway network around Purcellville, and provide a more direct route on major roadways to areas north and north east of the Route 7 bypass, including the schools complex at Woodgrove High School and Mountain View Elementary on Allder School Road (Route 711). The existing roadway network does not provide an ease of access for the local community to points north and northeast, particularly with the recent completion of Woodgrove High School northeast of the overpass. To access the Schools complex, drivers from the west, southwest, and east are forced to use a network of narrow and unsurfaced roads, or travel through downtown Purcellville.
Sponsoring Member
Jennifer Wexton
Representative · VA
See every project Jennifer Wexton has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
Loudoun County, Virginia
This recipient has 10 other projects funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/3f765124-e1d7-4d36-9dcc-64d4b0086df4" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.