Skip to main content
Back to search

Oklahoma Department of Transportation

Currently, the facility carries over 70,000 vehicles per day and is becoming one of the most capacity constrained corridors in the state. Because the volume of traffic is nearing the maximum capacity of the facility, travelling I-35 is becoming more undependable and even minor incidents can cause miles of backup. This project will increase capacity of I-35 from 4 through lanes to 6 through lanes. The widening of I-35 will contribute to growth in business productivity and will help control production and distribution costs. It will also yield more reliable, on-time delivery of freight and greater connectivity to air and rail terminals. Increased mobility for the public will create more job opportunities for workers. Travel for family and recreational activities will be easier. Interstate improvements will provide smooth, wide, fast, intersection free roads that can be used in times of national or regional crisis to move first responder equipment and supplies and can serve as an evacuation and rescue route.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

Currently, the facility carries over 70,000 vehicles per day and is becoming one of the most capacity constrained corridors in the state. Because the volume of traffic is nearing the maximum capacity of the facility, travelling I-35 is becoming more undependable and even minor incidents can cause miles of backup. This project will increase capacity of I-35 from 4 through lanes to 6 through lanes. The widening of I-35 will contribute to growth in business productivity and will help control production and distribution costs. It will also yield more reliable, on-time delivery of freight and greater connectivity to air and rail terminals. Increased mobility for the public will create more job opportunities for workers. Travel for family and recreational activities will be easier. Interstate improvements will provide smooth, wide, fast, intersection free roads that can be used in times of national or regional crisis to move first responder equipment and supplies and can serve as an evacuation and rescue route.

Recipient Organization

Oklahoma Department of Transportation

Locked

This recipient has 93 other projects funded in FFID. See the full history.

Start 7-day trial →

You hit 3 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
facility renovation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
3c3b6fae-ad6a-4e21-9909-5dc889480227

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/3c3b6fae-ad6a-4e21-9909-5dc889480227" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

TC

Tom Cole

R · OK · District OK-04

(202) 225-6165

Confirmed from FFID congressional source

OT

Oklahoma Department of Transportation

Grant recipient

Confirmed from FFID source

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.