Georgetown Municipal Water and Sewer Service (GMWSS)
Utility services satisfy basic needs for customers that significantly improve quality of life within a community. Availability of affordable and reliable utility infrastructure stimulates and sustains economic growth. Without well-maintained utility infrastructure, economic viability and community sustainability are greatly impaired. \nGMWSS owns and operates three wastewater treatment plants \u2013 WWTP No. 1, generally serving areas west of I-75, WWTP No. 2, generally serving Toyota and other areas east of I-75, and WWTP No. 3, serving the City of Stamping Ground.\nWWTP No. 1 has a capacity of 4.5 million gallons per day (MGD) and was last upgraded in 1991. Today, WWTP No. 1 is operating at 95% of its maximum daily capacity. WWTP No. 1 serves over 11,000 residential, commercial, institutional, and industrial customers including the downtown business district, the Georgetown Hospital, Great Crossings High School, Scott County High School, Georgetown College, Southland Christian Church, and others. \nWWTP No. 1 will receive flow from the South Sewer Extension being constructed to eliminate two, privately-owned, package WWTPs that have, for the last 30 years, failed to adequately treat wastewater from 375 units within two mobile home parks. The failure of these two package WWTPs has led to the pollution of the Royal Spring Aquifer \u2013 GMWSS\u2019 primary water source.\n\nKentucky\u2019s Energy and Environment Cabinet Division of Enforcement is expected to place GMWSS under a connection moratorium until completion of construction of WWTP No. 1.
Amount Appropriated
$5.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
Utility services satisfy basic needs for customers that significantly improve quality of life within a community. Availability of affordable and reliable utility infrastructure stimulates and sustains economic growth. Without well-maintained utility infrastructure, economic viability and community sustainability are greatly impaired. \nGMWSS owns and operates three wastewater treatment plants \u2013 WWTP No. 1, generally serving areas west of I-75, WWTP No. 2, generally serving Toyota and other areas east of I-75, and WWTP No. 3, serving the City of Stamping Ground.\nWWTP No. 1 has a capacity of 4.5 million gallons per day (MGD) and was last upgraded in 1991. Today, WWTP No. 1 is operating at 95% of its maximum daily capacity. WWTP No. 1 serves over 11,000 residential, commercial, institutional, and industrial customers including the downtown business district, the Georgetown Hospital, Great Crossings High School, Scott County High School, Georgetown College, Southland Christian Church, and others. \nWWTP No. 1 will receive flow from the South Sewer Extension being constructed to eliminate two, privately-owned, package WWTPs that have, for the last 30 years, failed to adequately treat wastewater from 375 units within two mobile home parks. The failure of these two package WWTPs has led to the pollution of the Royal Spring Aquifer \u2013 GMWSS\u2019 primary water source.\n\nKentucky\u2019s Energy and Environment Cabinet Division of Enforcement is expected to place GMWSS under a connection moratorium until completion of construction of WWTP No. 1.
Recipient Organization
Georgetown Municipal Water and Sewer Service (GMWSS)
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/309dc55d-3cac-4a10-8033-8ee15cd338be" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Georgetown Municipal Water and Sewer Service (GMWSS)
Grant recipient
Confirmed from FFID congressional source · website not yet enriched
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.