Skip to main content
Back to search

City of Davenport

The City of Davenport seeks funding for a flood mitigation project at the intersection of River Drive and Marquette Street (US 61). This location currently floods when the Mississippi River is at a relatively low level: stage 14.5. Underground storm sewer improvements at the intersection will install a new segment of future bypass storm sewer and backflow prevention on the existing storm sewer to keep the roadway dry until the area is flooded via overland. This will significantly reduce flood response from City operations and keep this area dry for an additional 3.5 feet of river flood stage. The underground improvements will keep River Drive open with unimpeded access until it needs to be closed due to overland flooding. \n\nThese improvements will significantly reduce the flood response needed at this intersection. Currently, action is required at approximately stage 14.5. The river backs up through the existing storm sewer system and floods out of nearby intakes which inundates the state highway. City staff set up pumps to actively flood fight to keep the road open. Using historical data from the U.S. Army Corps of Engineers, if this improvement had been in place 20 years ago, the City\u2019s flood response and impacts to transportation would have been reduced by 446 days. These improvements will gain 3.5 feet of passive flood protection to keep River Drive / US 61 open without intervention from the City up to stage 18.\n\nThe project is supported by the Iowa State Hazard Mitigation Office and will fulfill the mitigation goal to protect the health, safety, and quality of life for Iowa citizens while reducing or eliminating property losses, economic costs, and damage to the natural environment cause by a disaster.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The City of Davenport seeks funding for a flood mitigation project at the intersection of River Drive and Marquette Street (US 61). This location currently floods when the Mississippi River is at a relatively low level: stage 14.5. Underground storm sewer improvements at the intersection will install a new segment of future bypass storm sewer and backflow prevention on the existing storm sewer to keep the roadway dry until the area is flooded via overland. This will significantly reduce flood response from City operations and keep this area dry for an additional 3.5 feet of river flood stage. The underground improvements will keep River Drive open with unimpeded access until it needs to be closed due to overland flooding. \n\nThese improvements will significantly reduce the flood response needed at this intersection. Currently, action is required at approximately stage 14.5. The river backs up through the existing storm sewer system and floods out of nearby intakes which inundates the state highway. City staff set up pumps to actively flood fight to keep the road open. Using historical data from the U.S. Army Corps of Engineers, if this improvement had been in place 20 years ago, the City\u2019s flood response and impacts to transportation would have been reduced by 446 days. These improvements will gain 3.5 feet of passive flood protection to keep River Drive / US 61 open without intervention from the City up to stage 18.\n\nThe project is supported by the Iowa State Hazard Mitigation Office and will fulfill the mitigation goal to protect the health, safety, and quality of life for Iowa citizens while reducing or eliminating property losses, economic costs, and damage to the natural environment cause by a disaster.

Recipient Organization

City of Davenport

Locked

This recipient has 2 other projects funded in FFID. See the full history.

Start 7-day trial →

You hit 3 locked fields on this project.

Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
disaster resilience hazard mitigation
Opportunity Score
Unlock score →

Found an error in this record?

Report a data error
Technical & source detail
Record ID
2da78502-6398-460b-99a6-3b6fc7a687ff

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/2da78502-6398-460b-99a6-3b6fc7a687ff" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

MM

Mariannette Miller-Meeks

R · IA · District IA-01

(202) 225-6576

Confirmed from FFID congressional source

CD

City of Davenport

Grant recipient

Confirmed from FFID source

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.