Town of Londonderry
Recent changes to the Intermunicipal Agreement with the Town of Derry has necessitated the construction of a sewer line and pump station to connect to existing sewer infrastructure leading to the Manchester Waste Water Treatment Plant, as the Derry Waste Water Treatment Plant does not have have sufficient capacity to meet the needs of future development in south Londonderry and Woodmont Commons. The current Intermunicipal agreement between the Towns of Londonderry and Derry allots Londonderry a total of 500,000 gpd, while existing and future development in south Londonderry, including the west side of Woodmont Commons, is projected to demand the need for about 1,000,000 gpd of flow.\n \n In the Woodmont Commons Planned Unit Development (PUD) alone, about 400 acres has been designated for commercial, institutional and residential development. The Woodmont Commons PUD Master Plan for this area permits up to 1,080 new residential dwelling units, 170,000 square feet of institutional uses (hospital, nursing home, assisted living), 532,500 square feet of commercial space and 300,000 square feet of office space. The construction of sewer infrastructure is essential for the economic growth of this area, as well as the remaining undeveloped areas in south Londonderry, in accordance with the Woodmont Commons PUD Master Plan.\n \n The capacity limitations can be expected to inhibit the development of other parts of south Londonderry. This project will also facilitate the faster development of the Exit 4A area on the east side of Interstate 93, which is also part of the PUD. The Exit 4A sewer flows can only be redirected to Manchester at great expense. By redirecting Woodmont Commons flows to Manchester, the Town anticipates the Derry plant can receive the Exit 4A flows without incurring these prohibitive costs.
Amount Appropriated
$4.0M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
Recent changes to the Intermunicipal Agreement with the Town of Derry has necessitated the construction of a sewer line and pump station to connect to existing sewer infrastructure leading to the Manchester Waste Water Treatment Plant, as the Derry Waste Water Treatment Plant does not have have sufficient capacity to meet the needs of future development in south Londonderry and Woodmont Commons. The current Intermunicipal agreement between the Towns of Londonderry and Derry allots Londonderry a total of 500,000 gpd, while existing and future development in south Londonderry, including the west side of Woodmont Commons, is projected to demand the need for about 1,000,000 gpd of flow.\n \n In the Woodmont Commons Planned Unit Development (PUD) alone, about 400 acres has been designated for commercial, institutional and residential development. The Woodmont Commons PUD Master Plan for this area permits up to 1,080 new residential dwelling units, 170,000 square feet of institutional uses (hospital, nursing home, assisted living), 532,500 square feet of commercial space and 300,000 square feet of office space. The construction of sewer infrastructure is essential for the economic growth of this area, as well as the remaining undeveloped areas in south Londonderry, in accordance with the Woodmont Commons PUD Master Plan.\n \n The capacity limitations can be expected to inhibit the development of other parts of south Londonderry. This project will also facilitate the faster development of the Exit 4A area on the east side of Interstate 93, which is also part of the PUD. The Exit 4A sewer flows can only be redirected to Manchester at great expense. By redirecting Woodmont Commons flows to Manchester, the Town anticipates the Derry plant can receive the Exit 4A flows without incurring these prohibitive costs.
Sponsoring Member
Chris Pappas
Representative · NH
Want to see more like this?
Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- water infrastructure
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/0beb970a-65dc-41a2-9258-5b31e7b91675" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.