San Joaquin County
The Project strikes an important balance between supporting goods movement and economic development and maintaining the rural community of Banta. Housing varies from older homes in the southern portion of the community to newer ranch-style homes on larger parcels north of Grant Line Road. The community's land use pattern has been heavily influenced by the railroad, which bisects the community. Commercial uses are clustered around the Grant Line Road crossing of the UPRR tracks. There is a church and an elementary school accessible from Grant Line Road (Figure 6). It is expected that Banta will remain a rural community, providing limited services for the residents and adjacent agricultural areas.\nEarly during the environmental process, the local community expressed a strong desire to reroute traffic around their community rather than simply widen the existing roadway to provide the needed capacity. Residents wanted to maintain their rural way of life and not become a suburb for the growing City of Tracy. Residents also wanted to reduce potential cut through traffic into Banta from the realignment by limiting access points into the community.\nThe roadway realignment greatly preserves the community\u2019s way of life. The vast majority of traffic will bypass Banta to the south. As shown in the Project\u2019s traffic study, this reduces traffic volumes from 20,900 ADT in Banta and 18,900 ADT in the Stoneridge neighborhood in 2035 without the Project to 1,900 in Banta and 2,000 in Stoneridge in 2035 with the construction of the bypass. This is a 90.9 percent traffic decrease in Banta and 89.4 percent in Stoneridge. \nAdditionally, the Project will provide safety and active transportation enhancements in Banta. The Project will close the at-grade crossings of the UPRR tracks at 6th Street and Banta Road. The Project will construct safety enhancements at the G Street and Grant Line Road Intersection to provide vehicular and pedestrian access.
Amount Appropriated
$2.5M
Federal Funding Lifecycle
FY2023FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.
Congressional Request
Member submits CPF / CDS
FFIDEnacted
Signed into appropriations law
FFIDAgency Administration
Procurement route not yet determined
SAM.gov / Grants.gov
Opportunity posted publicly
Federal Award
Obligation recorded in USASpending
Evidence Dossier
Federal Award Record
Start a free trial to access this section.
Start free trial →Supporting Evidence
Start a free trial to access this section.
Start free trial →Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.
Enacted — no verified award linked by FFID
This project has been enacted into law. FFID has not yet linked a verified feder…
Start a free trial to see the full commercial context →Project Description
The Project strikes an important balance between supporting goods movement and economic development and maintaining the rural community of Banta. Housing varies from older homes in the southern portion of the community to newer ranch-style homes on larger parcels north of Grant Line Road. The community's land use pattern has been heavily influenced by the railroad, which bisects the community. Commercial uses are clustered around the Grant Line Road crossing of the UPRR tracks. There is a church and an elementary school accessible from Grant Line Road (Figure 6). It is expected that Banta will remain a rural community, providing limited services for the residents and adjacent agricultural areas.\nEarly during the environmental process, the local community expressed a strong desire to reroute traffic around their community rather than simply widen the existing roadway to provide the needed capacity. Residents wanted to maintain their rural way of life and not become a suburb for the growing City of Tracy. Residents also wanted to reduce potential cut through traffic into Banta from the realignment by limiting access points into the community.\nThe roadway realignment greatly preserves the community\u2019s way of life. The vast majority of traffic will bypass Banta to the south. As shown in the Project\u2019s traffic study, this reduces traffic volumes from 20,900 ADT in Banta and 18,900 ADT in the Stoneridge neighborhood in 2035 without the Project to 1,900 in Banta and 2,000 in Stoneridge in 2035 with the construction of the bypass. This is a 90.9 percent traffic decrease in Banta and 89.4 percent in Stoneridge. \nAdditionally, the Project will provide safety and active transportation enhancements in Banta. The Project will close the at-grade crossings of the UPRR tracks at 6th Street and Banta Road. The Project will construct safety enhancements at the G Street and Grant Line Road Intersection to provide vehicular and pedestrian access.
Sponsoring Member
Jerry McNerney
Representative · CA
See every project Jerry McNerney has sponsored, broken out by fiscal year and status.
Start 7-day trial →Recipient Organization
San Joaquin County
This recipient has 7 other projects funded in FFID. See the full history.
Start 7-day trial →You hit 3 locked fields on this project.
Unlock sponsor history, recipient funding, and full commercial context — free for 7 days.
Data Provenance
- Source
- House Appropriations Committee
- Status
- enacted
- Fiscal Year
- FY2023
- Category
- other unclassified
- Use Case
- facility renovation
- Opportunity Score
- Unlock score →
Found an error in this record?
Report a data errorTechnical & source detail
Embed this project
Share a live status card on your site or article.
<iframe src="https://federalfundingintelligence.com/api/embed/06dc9018-054c-4b6a-984b-87bac83b7cd5" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>Find more like this
Procurement pursuit intelligence
This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.
Principals
Inferred procurement pathway
low confidenceLikely procurement owner
unknown
Funding vehicle
grant
Expected channel
Multiple channels — see below
FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.
Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.
Discovery sources to check manually
Discovery onlyThese portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.
Not project-specific. Portal coverage varies by state. Check all channels manually.
Procurement signals
Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.