Skip to main content
Back to search

Port of San Diego

The 90+ year-old pier requires significant upgrades and improvements before transforming into a public park, honoring and celebrating Veterans. The Port of San Diego and the USS Midway Museum have partnered together to upgrade the pier and phase one of the project is to complete major pier infrastructure work. The funds requested would directly support that work, to include pier piling upgrades, utility upgrades, building demolition, concrete removal and any environmental impact work. This work ensures the proper foundation prior to building the park. Dynamic educational components throughout the park will tell the story and history of Navy Pier, naval aviation, the USS Midway, and the men and women who made the ultimate sacrifice all in the name of Freedom. Other notable elements of Freedom Park include waterfront access, prominent monuments, tributes, and memorials. A dedicated pedestrian promenade will run through grassy areas, shade trees, park benches, and a restroom. Event space will be available to the public for family celebrations, military ceremonies, and more.

Federal Funding Lifecycle

FY2023

FFID tracks stages 1–2 — stages 3–5 vary by agency, assistance type, and earmark structure.

Congressional Request

Member submits CPF / CDS

FFID

Enacted

Signed into appropriations law

FFID

Agency Administration

Procurement route not yet determined

SAM.gov / Grants.gov

Opportunity posted publicly

Federal Award

Obligation recorded in USASpending

Funding enacted — no verified award linked by FFID. The downstream procurement route — grant, cooperative agreement, or competitive solicitation — depends on the agency and earmark type. Check SAM.gov and Grants.gov for current status.

Evidence Dossier

1 source

Federal Award Record

Start a free trial to access this section.

Start free trial →

Supporting Evidence

Start a free trial to access this section.

Start free trial →

Tier A = Congressional Record or GovInfo. Tier B = committee report or member disclosure. ✓ Verified = exact document match. ~ Verified recipient = entity-level match only.

Enacted — no verified award linked by FFID

This project has been enacted into law. FFID has not yet linked a verified feder

Start a free trial to see the full commercial context →

Project Description

The 90+ year-old pier requires significant upgrades and improvements before transforming into a public park, honoring and celebrating Veterans. The Port of San Diego and the USS Midway Museum have partnered together to upgrade the pier and phase one of the project is to complete major pier infrastructure work. The funds requested would directly support that work, to include pier piling upgrades, utility upgrades, building demolition, concrete removal and any environmental impact work. This work ensures the proper foundation prior to building the park. Dynamic educational components throughout the park will tell the story and history of Navy Pier, naval aviation, the USS Midway, and the men and women who made the ultimate sacrifice all in the name of Freedom. Other notable elements of Freedom Park include waterfront access, prominent monuments, tributes, and memorials. A dedicated pedestrian promenade will run through grassy areas, shade trees, park benches, and a restroom. Event space will be available to the public for family celebrations, military ceremonies, and more.

Recipient Organization

Port of San Diego

Want to see more like this?

Start a free 7-day trial for full member intelligence, recipient funding history, opportunity scores, CSV export, and all 112,898 projects.

Start free trial

Data Provenance

Source
House Appropriations Committee
Status
enacted
Fiscal Year
FY2023
Category
other unclassified
Use Case
parks recreation trails

Found an error in this record?

Report a data error
Technical & source detail
Record ID
008dd10e-6bad-47d4-b300-bc86b5f51dd9

Embed this project

Share a live status card on your site or article.

<iframe src="https://federalfundingintelligence.com/api/embed/008dd10e-6bad-47d4-b300-bc86b5f51dd9" width="100%" height="190" frameborder="0" style="border:none;border-radius:12px;" title="Federal earmark project"></iframe>

Procurement pursuit intelligence

This project has been enacted. FFID maps funded projects to likely downstream procurement channels — including recipient portals, state and local systems, agency programs, and Grants.gov. SAM.gov is monitored, but many CPF/CDS-funded opportunities appear first through recipient or state/local procurement systems.

Principals

SP

Scott Peters

D · CA · District CA-50

(202) 225-0508

Confirmed from FFID congressional source

PD

Port of San Diego

Grant recipient

Confirmed from FFID congressional source · website not yet enriched

FA

Federal agency

Administering agency

Inferred pathway based on agency

Inferred procurement pathway

low confidence

Likely procurement owner

unknown

Funding vehicle

grant

Expected channel

Multiple channels — see below

FFID could not determine the procurement channel with high confidence for this agency and category combination. Check the agency program page, Grants.gov, the state procurement portal, and the recipient's own procurement page.

Agency not specifically mapped. Check Grants.gov and the recipient's own procurement portal.

Discovery sources to check manually

Discovery only

These portals are not verified matches for this project. SAM.gov and state portals are general search starting points — not confirmed procurement channels.

Not project-specific. Portal coverage varies by state. Check all channels manually.

Procurement signals

Procurement monitoring has not yet run for this project. No conclusion can be drawn about whether an opportunity exists.